Core drilling JHA

A saw-cut JHA will talk about trenches and miss a core dropping onto a receptionist and a conduit in the slab. Core work is a through-penetration job.

Typical scope

  • Scan
  • Other-side pause
  • Slurry control
  • Core catch
  • Hole cover
  • Wet electrical

Quick answer

A core-drilling JHA covers cutting round holes through slabs or walls: what's on the other side, silica/slurry, falling cores, and occupants below.

Primary topic: core drilling jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.

What usually goes wrong

These are the operational gaps that make a generic Word JHA fail on the next job.

  • Saw JHA

    No other side.

  • No scan

    Post-tension hit.

  • Hole left for lunch

    Unmarked opening.

Example

4-inch core through a lobby slab

Built from one job description. You review and adjust every item before issuing it.

Puget Concrete Cutting · Pike Street lobby, Seattle

Seattle lobby, GPR scan, receptionist relocated, wet core with catcher, slurry drummed, hole covered before the crew gets coffee.

What to get right on this document

Scan and as-builts

Before the bit spins.

Named person below

Pause them.

Cover at once

The hole is a fall hazard.

What this JHA has to cover

A saw-cut JHA will talk about trenches and miss a core dropping onto a receptionist and a conduit in the slab. Core work is a through-penetration job.

A core drilling jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.

Typical hazards to analyze on this job

  • Core or tool falling through to occupants
  • Hitting conduit, post-tension, or gas
  • Silica and slurry
  • Electric shock in wet drilling
  • Pinch at the rig
  • Uncovered hole after the core comes out

Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.

A job sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.

  • Scan the slab; confirm with the facility what is embedded
  • Protect and pause the space on the other side
  • Set the rig; control slurry and silica
  • Catch the core; do not let it free-fall
  • Cover or guard the hole immediately
  • Release the other side after a walk

Other people in the area

The receptionist under a lobby slab is occupancy. Write the pause and the catcher, not 'someone downstairs will watch'.

Chemicals, dust, and SDS inputs

An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:

  • Silica slurry
  • Cooling water
  • Sealants after the penetration

How SafeForJob helps

  • Describe this job in plain English and get suggested steps, hazards, and controls
  • Edit every line before you download or issue
  • Reuse a previous JHA and catch old client or site names
  • Share a link so the crew can read the current revision and acknowledge it

What this page is not

This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer core drilling jha for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.

Related pages

All jha by job · JHA by trade · Free JHA generator

Questions

Do I always scan?
Yes unless you have a reliable as-built and the facility agrees. Write the method.
Wall cores?
Other-side occupancy still exists. Write it.
Post-tension slabs?
Stop for engineering if you are in a PT band.
Is the hole a confined space?
Usually no — it is a fall/drop hazard. Write that.