Free JHA template / form
Job hazard analysis template
Skip the blank Word table or form. Describe the job and get a structured JHA draft to review — or use this outline as your checklist. Not OSHA certified.
New JHA
Suggested
What goes in a JHA template
- Job details — Client or GC, site, date, who prepared and reviewed it
- Scope — What is being done, voltage or height, other trades in the area
- Job steps — Ordered sequence from mobilize through restore — not a random activity list
- Hazards and controls — Named hazards with controls that fit the hierarchy, not slogans
- PPE — Matched to the task, not a company boilerplate dump
- Emergency — Who to call, assembly, clinic or site contact
- Acknowledgement — Crew confirms they read the current revision
Why not paste last month's file?
- Old client and site names stay in the steps.
- Lockout, edge protection or drop zones from another room get copied forward.
- Generic “use PPE” lines replace the critical control.
- Nobody knows which revision the crew actually briefed.
Need a JSA instead?
Same structure, different label. Use the JSA template if that is what your GC asks for.
Questions
- Is there an official OSHA JHA template?
- No. OSHA 3071 explains the job hazard analysis method and shows sample worksheets. Employers design forms that fit their work. A blank table still has to name this site, these steps and these energy sources.
- Can I download a Word JHA template?
- Start online so suggestions match the job description, then print or save a PDF from your browser. Reusing last month’s Word file is how old client names and wrong isolation points survive.
- What fields should a JHA template include?
- Job and location, ordered steps, hazards per step, controls you will actually use, PPE, who reviewed it, and how the crew acknowledges the current revision.
- Is a JHA template enough on its own?
- A blank layout is not a job-specific analysis. Fill it for this work, confirm every line, and update it when access, occupancy or energy changes.