SafeForJob · US
Guides
Clear definitions and practical next steps — without fake OSHA endorsement.
40 pages
- What is a JHA?A job hazard analysis (JHA) breaks a job into steps, names the hazards in each step, and records the controls you will actually use. It is a job-specific doc…
- JHA vs JSAJHA (job hazard analysis) and JSA (job safety analysis) are the same job-step method with different labels. Clients, GCs, and industries pick a term. The doc…
- OSHA JHA requirementsOSHA does not require one universal JHA form, scoring matrix, or file name. OSHA does require employers to furnish a workplace free of recognized hazards and…
- How to write a JHAWrite a JHA by watching or walking the job, listing steps in order, naming the hazard in each step, and recording the control you will use. Then brief the cr…
- Steps, hazards, controlsA usable JHA maps each job step to the hazards in that step and the controls that prevent them. A list of hazards with no steps, or a list of steps with 'PPE…
- JHA template guideA JHA template is a structure: job details, ordered steps, hazards, controls, PPE, and acknowledgement. It is not a finished analysis. OSHA does not publish…
- JSA template guideA JSA template is the same structure as a JHA template with a different title: job, steps, hazards, controls, PPE, acknowledgement. Fill it for this job. The…
- Crew acknowledgementAcknowledgement means the people doing the work saw the current JHA, had a chance to raise a conflict, and are working to that revision. A signature on last…
- Lockout/tagout on a JHALockout/tagout on a JHA means every energy source is named, isolation devices are identified, a try-out is in the sequence, and restore is controlled. Writin…
- Fall protection on a JHAFall protection on a JHA means the system is named for this edge, this height, and this duration — guardrail, PFAS, restraint, warning line, or scaffold — pl…
- Excavation on a JHAAn excavation JHA has to show today's soil, the protective system, locates, water, spoils, access, and the competent person's inspection. Depth in feet witho…
- Hot work on a JHAHot work on a JHA means a permit, both sides of the work inspected, combustibles protected, ventilation, a fire watch with no other job, and a watch that con…
- Confined space on a JHAIf the space is a confined space, the JHA cannot pretend it is a normal room. Atmosphere, attendant, rescue, and the permit (if required) belong in the seque…
- Silica on a JHAWhen you cut, grind, or drill materials that contain crystalline silica, the JHA must name the tool, the method (water, LEV, or both), housekeeping, and who…
- Reviewing a JHA with the crewA crew review is a short, job-site talk that walks the steps, names the critical control, asks what changed, and records acknowledgement of this revision. It…
- When to update a JHAUpdate a JHA when the job, location, energy sources, occupancy, weather, or crew competence changes in a way that makes yesterday's controls untrue. Reuse th…
- Create a JHA onlineCreate a site-specific JHA online from a job description. Edit every line. Not an OSHA stamp, and not legal advice.
- Site-specific JHAA site-specific JHA names this location’s lockouts, occupancy and sequence. Generic PDFs get rejected. Review before issue — not an OSHA stamp.
- Free template vs site-specificA free template is a starting point. A site-specific JHA names this isolation and these people. Clients reject the header-only swap.
- JHA for subcontractorsSubcontractors need a JHA the GC can brief from: this site, these people, this lockout. Not a re-badged PDF.
- JHA for general contractorsGCs need subcontractors to submit job-specific JHAs they can brief from. Consistent structure, unique site facts. Not an OSHA stamp.
- Occupied-building JHAAn occupied-building JHA treats patients, students, guests and shoppers as occupancy controls. Tape is not a barrier. Not an OSHA stamp.
- Night-work JHANight works are not the same job in the dark. Fatigue, silenced detection and a doors-open deadline are the usual fails.
- How to write a JSAA JSA breaks the job into steps, hazards and controls. Write this site’s facts. Not an OSHA stamp.
- Chemicals on a JHAAn SDS informs the JHA. It does not replace task-based controls for who is exposed and for how long. Not an OSHA stamp.
- Process dust on a JHASilica, wood dust and welding fume are often generated by the work, not delivered in a can. Assess the cut or weld. Not an OSHA stamp.
- Who reviews a JHASafeForJob can draft. A competent person reviews, edits and issues the JHA for this job. Software is not a signature.
- Issued vs draft JHAA draft is for editing. An issued JHA is the frozen version you briefed. Keep history. Not an OSHA stamp.
- JHA library reuseReuse reviewed hazards and methods, then write this site’s occupancy and lockouts. Do not re-badge last month’s PDF.
- School JHAA school JHA has to map who is still on campus: camps, community users, caretakers. Holiday is not empty. Not an OSHA stamp.
- Hospital JHAA hospital JHA has to name ICRA barriers, detection restore and who can stop a list. Not an OSHA stamp.
- Construction JHA basicsA construction JHA names the sequence, the critical control and who else is on site. Review before issue — not an OSHA stamp.
- Maintenance JHAA maintenance JHA has to treat residual energy and the live sister machine as real. PPM copy-paste fails. Not an OSHA stamp.
- Utilities JHAA utilities JHA names the clearance, approach distances and who walks the ROW. Not an OSHA stamp.
- Manufacturing JHAA manufacturing JHA treats the live sister line as real and puts restore in operations’ order. Not an OSHA stamp.
- Retail overnight JHAA retail overnight JHA has to cover food safety, receiving jacks and a floor that must be shoppable at open. Not an OSHA stamp.
- Data-center JHAA data-center JHA names the load owner, the PDU and one-tile discipline. Cabling JHAs miss heat and airflow. Not an OSHA stamp.
- Energy-sector JHAEnergy-sector JHAs name which train is live, residual product and who owns start-up. Not an OSHA stamp.
- JHA acknowledgementAcknowledgement proves who was briefed on this issued JHA revision. It is not a certificate of competence. Not an OSHA stamp.
- When is a JHA needed?Employers must assess and control hazards. Many GCs require a written JHA. That is not the same as a single OSHA-mandated form.