Skip to content
SafeForJob

JSA software

JSA software with the same workflow as a JHA

When the paperwork says job safety analysis, use that label without rebuilding a second product. Describe the job, review suggestions, issue a versioned PDF. From $24 a month.

Almost ready.

  • Client confirmed
  • Site confirmed
  • 7 hazards reviewed

Check these

  • Previous client name detected“Westfield Logistics” found in the job stepsReplace
  • Emergency arrangements missingClinic contact and assembly point not addedAdd details
  • Chemical row incompleteRefrigerant exposure not named on the rooftop stepsReview
  • One hazard still needs reviewManual handlingReview

One system of work. Your preferred label.

Crews and GCs use JSA and JHA interchangeably. SafeForJob keeps the analysis job-specific either way.

Your old files

  • Westfield-Warehouse-JHA.docx
  • Phoenix-Clinic-RTU-JHA-v3.pdf
  • Roof-HVAC-template-OLD.docx

We found reusable content.

hazards
17
hazards
controls
43
controls
job steps
12
job steps
PPE items
6
PPE items

Control

Needs review

Inspect anchorage and connect before approaching the edge.

Found in 6 documents

Your company library

  • Fall protection8 docs
  • Lockout / tagout7 docs
  • Hot work5 docs
  • Manual handling9 docs

Next JHA built from your own content.

Read JHA vs JSA or start from the JSA template.

What you get — and what you don't

  • JSA label on drafts, issued PDFs and share links
  • Same step / hazard / control structure as JHA
  • Company library for approved controls
  • Checks before issue for leftover site names
  • Crew acknowledgement without worker seats
  • USD pricing on the same subscription as UK RAMS
  • Not a separate JSA engine with different rules
  • Not OSHA approval of your document
  • Not a substitute for employer judgment on this job
CURRENT DOCUMENTREV 02

Katy Warehouse

JHA · Issued 14 Oct 2026

  • About this job
  • Main hazards
  • Job steps
  • PPE
  • Emergency information
I've read this

No account needed

Simple pricing

Free

Try it on a real job.

$0 forever

  • 2 JHAs a month
  • 1 active project
  • Standard PDF
  • Basic library

Starter

For owner-operators and small teams.

$24 /month

  • 10 JHAs a month
  • JHA / JSA documents
  • Your logo and company details
  • Company library
  • Worker acknowledgements
Most popular

Pro

For growing contractors.

$49 /month

  • Generous JHAs allowance
  • JHA / JSA documents and company library
  • Import your existing JHAs (review required)
  • Revision history
  • Share links for crew acknowledgement
  • Client links
  • 3 office users

Business

For larger teams.

$99 /month

  • 10 office users
  • Permissions
  • Custom templates
  • Audit log
  • Higher import and volume limits
  • Priority support

Prices exclude sales tax. Start free with no card. Upgrade when you need more volume or import. Monthly plans. Cancel any time.

Compare plans · Free generator

Questions

Is JSA software different from JHA software?
Not in SafeForJob. JSA and JHA share one workflow. Choose the label your GC or employer uses; the document structure stays steps, hazards, controls and PPE.
Can I switch from JHA to JSA later?
Yes. Set the organisation document noun to JSA. Issued PDFs and share screens use that name going forward.
Does OSHA require a JSA form?
No single mandated JSA template. Employers must keep workplaces free of recognized hazards; a job-specific analysis is how many contractors show the work was thought through. This software is not OSHA-certified.
Where do I start if I only have Word JSAs?
Create one job-specific JSA free in the generator. Paid plans unlock higher volume and a company library so the next job is not another paste from last month.