JHA and JSA software for US contractors
Job hazard analyses in minutes
Describe the job, review the hazards and controls, and create professional JHAs or JSAs without rebuilding everything from scratch.
Built for US contractors and field teams. No account needed to start free.
Suggested
Switch without starting again
Already have JHAs? Don't start again.
On Pro or Business, bring JHAs you already use. We help extract hazards, controls and job steps; you review every item before it enters your company library.
Your old files
- Westfield-Warehouse-JHA.docx
- Phoenix-Clinic-RTU-JHA-v3.pdf
- Roof-HVAC-template-OLD.docx
We found reusable content.
- hazards
- 17
- hazards
- controls
- 43
- controls
- job steps
- 12
- job steps
- PPE items
- 6
- PPE items
Control
Needs reviewInspect anchorage and connect before approaching the edge.
Found in 6 documents
Your company library
- Fall protection8 docs
- Lockout / tagout7 docs
- Hot work5 docs
- Manual handling9 docs
Next JHA built from your own content.
Example figures. Import is assistive and gated to paid plans. Nothing is added to your library until you review it.
How it works
Three steps. No forms.
How it works
- 1
Tell us about the job
Describe the work, name the site, or paste the scope the GC sent you.
- 2
Review what matters
Confirm the steps, hazards, controls and PPE. Every suggestion shows why it is there.
- 3
Issue your JHA
Create a professional PDF, share it, and collect acknowledgements from the crew.
Chemicals and SDS
An SDS is an input, not a JHA.
A Safety Data Sheet tells you about the product. It does not name this job, this quantity, or who else is in the room. Review the SDS, then put the exposure on the analysis for this shift.
- Name the chemical, quantity, and how long the crew is exposed
- Silica, refrigerants, solvents and fumes sit on the job steps — not in a leftover PDF
- The SDS still has to match the product you actually brought to site
R410A-refrigerant-SDS.pdf
Example SDS — review against the product on this job
We found:
- Product
- R-410A refrigerant
- SDS date
- June 12, 2026
- Signal word
- Warning
- Hazards
- Asphyxiation · frostbite
- PPE
- Gloves, glasses
- First aid
- 4 routes found
This comes from the SDS. It isn't yet on the JHA.
How do you use it?
JHA chemical row
R-410A · recovery on an occupied roof
JHA Check
Catch the things copying and pasting misses.
Before you issue anything, we check that the analysis reflects this job — not last month's warehouse. Every issue comes with a button to fix it.
- Old client and site names left in the steps
- Generic controls that never name lockout, the edge, or the occupied floor
- Missing emergency arrangements
- Hazards that still rely only on PPE
Almost ready.
- Client confirmed
- Site confirmed
- 7 hazards reviewed
Check these
- Previous client name detected“Westfield Logistics” found in the job stepsReplace
- Emergency arrangements missingClinic contact and assembly point not addedAdd details
- Chemical row incompleteRefrigerant exposure not named on the rooftop stepsReview
- One hazard still needs reviewManual handlingReview
Company library
Every JHA makes the next one easier.
Reuse your own reviewed company content rather than starting from a blank template every time. Controls your crew already trusts appear first — still confirmed site by site.
Controls · Lockout / tagout
Used by your company
- Lockout with personal padlocks and try-startUsed in 14 previous JHAs
- Prove absence of voltage with a known-live testerUsed in 14 previous JHAs
System suggestion
- hazards
- 28
- hazards
- controls
- 71
- controls
- steps
- 19
- steps
- chemicals
- 14
- chemicals
For the crew on site
JHAs where the work happens.
Crew members open the latest JHA from their phone, read the hazards and job steps, and confirm they've read it — without creating an account. If they open an old revision, they're told a newer one exists.
Katy Warehouse
JHA · Issued 14 Oct 2026
- About this job
- Main hazards
- Job steps
- PPE
- Emergency information
No account needed
Who it's for
Made for trades, not safety departments.
Small contractors and field-service teams from owner-operators to around 100 people.
Trades
- Electrical
- HVAC
- Roofing
- Plumbing
- Excavation
- Steel erection
- Scaffolding
- Painting
- Welding
- Concrete
- Solar PV
- Telecom
- Warehouse
- Millwright
- Masonry
- Glazing
- Fire protection
- Landscaping
- Facilities maintenance
- General contractor
Also browse the job library and JHA guides.
The difference
Less copying. Less rewriting. Better JHAs.
Old way compared with our way
The usual way
- 1 Find last month's JHA
- 2 Duplicate the Word file
- 3 Replace the client
- 4 Replace the site
- 5 Edit the hazard table
- 6 Search for the SDS
- 7 Attach the PDFs
- 8 Export
- 9 Email
- 10 Hope nothing old remains
With SafeForJob
- 1 Describe the job
- 2 Review suggestions
- 3 Reuse approved content
- 4 Put the SDS on this job
- 5 Run the check
- 6 Issue
Built around how US contractors actually write JHAs.
No badges, no claims we can't back up. Just a clearer way to produce documents you're responsible for.
Trust
You stay in control
Every suggestion is marked Suggested until you confirm it. Nothing is issued without your review.
Clear provenance
See why each suggestion appeared, and which SDS a chemical row came from.
Private by default
The free tools read your files in your browser. They aren't uploaded to us.
Documents you'd be proud to send
Clean issued PDFs with revision control, page numbers and an acknowledgement page.
We help you structure a job-specific JHA or JSA. OSHA does not certify this software or mandate a single form. For what employers actually have to do, see OSHA 3071 — Job Hazard Analysis and OSHA — Hazard identification and assessment.
Pricing
Start free. Upgrade when it's saving you time.
Pricing
Starter
For owner-operators and small teams.
$24 /month
owner-operators sending a few JHAs a month.
Pro
For growing contractors.
$49 /month
Companies regularly creating JHAs for multiple sites.
Business
For larger teams.
$99 /month
Teams with an office manager and several people preparing JHAs.
Prices exclude sales tax. Start free with no card. Upgrade when you need more volume or import. Monthly plans. Cancel any time.
Got a JHA to issue tonight?
Describe the job and see what we suggest. No account needed until you want to save it.