Skip to content

About this free JHA generator

Describe the job in plain English. We suggest work steps, hazards and controls from a US JHA catalog — every suggestion is editable. You review what stays, preview a draft, then continue in SafeForJob to issue, share and reuse approved company content.

Your work is saved in this browser as you go. No account is needed until you want to save and reuse it. This tool is not an OSHA form and does not certify compliance.

How it works

  1. Describe the job and site in your own words.
  2. Review suggested steps, hazards, controls and PPE — edit or deselect anything that does not fit.
  3. Preview the draft, then continue with an account to issue and share when you are ready.

What this tool does — and does not

  • Drafts a job-specific JHA (or JSA-labelled document) from your description
  • Keeps every line editable before you treat it as ready
  • Does not replace employer judgment on this site, energy source or crew
  • Does not claim OSHA certification or a mandated universal form

Prefer a blank template or paid software?

Use the job hazard analysis template or job safety analysis template as a checklist. For company library, revision control and crew acknowledgements, see JHA software and JSA software.

Guides and examples

Read what a JHA is, how to write a JHA, create a JHA online, JHA vs JSA, best JHA software 2026, or browse JHAs by electrical, HVAC, roofing and job.

Questions

Is this free JHA generator really free?
Yes. Describe the job, review suggestions and preview a draft in your browser with no account and no card. An account is only needed when you want to save, issue, share acknowledgements or reuse company library content.
Can I use this for a JSA instead of a JHA?
Yes. The analysis is the same job-step-hazard-control structure. Label the document JSA or JHA based on what your GC or employer asks for. See JHA vs JSA if you are unsure.
Does OSHA require this form?
No. OSHA does not mandate a single universal JHA template. OSHA 3071 describes the method. This tool helps you draft a job-specific analysis — it is not an OSHA form and does not certify compliance.
Where do the suggested hazards come from?
From a US JHA catalog matched to the job description you typed. Every step, hazard and control is editable. You confirm what stays before treating the draft as ready to brief.
What happens after I preview?
Continue in SafeForJob to save the draft to your organisation, issue a versioned PDF, share a phone view for crew acknowledgement, and reuse approved content on the next job.
Is my draft stored on your servers?
While you work free in the browser, the draft is saved locally on this device. It is sent to SafeForJob only when you choose to continue with an account.