JHA software
JHA software that feels faster than Word
Describe the job, reuse controls your company already trusts, catch leftover site names, and get the current revision onto phones. Self-serve, from $24 a month.
Almost ready.
- Client confirmed
- Site confirmed
- 7 hazards reviewed
Check these
- Previous client name detected“Westfield Logistics” found in the job stepsReplace
- Emergency arrangements missingClinic contact and assembly point not addedAdd details
- Chemical row incompleteRefrigerant exposure not named on the rooftop stepsReview
- One hazard still needs reviewManual handlingReview
Stop rebuilding the same Word file.
Reuse reviewed company hazards and controls on the next named job — still confirmed site by site.
Your old files
- Westfield-Warehouse-JHA.docx
- Phoenix-Clinic-RTU-JHA-v3.pdf
- Roof-HVAC-template-OLD.docx
We found reusable content.
- hazards
- 17
- hazards
- controls
- 43
- controls
- job steps
- 12
- job steps
- PPE items
- 6
- PPE items
Control
Needs reviewInspect anchorage and connect before approaching the edge.
Found in 6 documents
Your company library
- Fall protection8 docs
- Lockout / tagout7 docs
- Hot work5 docs
- Manual handling9 docs
Next JHA built from your own content.
Example figures. Library import of existing packs is on paid plans after you review each item. Prefer a JSA label? See JSA software.
What you get — and what you don't
- Job-first JHAs with explainable suggestions
- Ordered steps, hazards, controls and PPE
- Company library built from content you approve
- Checks for leftover client or site names before issue
- Revision control and superseded warnings
- Phone view with crew acknowledgements — no worker accounts
- Published monthly USD pricing, no setup fee
- Not an enterprise EHS platform
- Not OSHA certification or a mandated form
- No compliance guarantees — you stay in control
Katy Warehouse
JHA · Issued 14 Oct 2026
- About this job
- Main hazards
- Job steps
- PPE
- Emergency information
No account needed
Simple pricing
Free
Try it on a real job.
$0 forever
- 2 JHAs a month
- 1 active project
- Standard PDF
- Basic library
Starter
For owner-operators and small teams.
$24 /month
- 10 JHAs a month
- JHA / JSA documents
- Your logo and company details
- Company library
- Worker acknowledgements
Pro
For growing contractors.
$49 /month
- Generous JHAs allowance
- JHA / JSA documents and company library
- Import your existing JHAs (review required)
- Revision history
- Share links for crew acknowledgement
- Client links
- 3 office users
Business
For larger teams.
$99 /month
- 10 office users
- Permissions
- Custom templates
- Audit log
- Higher import and volume limits
- Priority support
Prices exclude sales tax. Start free with no card. Upgrade when you need more volume or import. Monthly plans. Cancel any time.
Compare plans · JHA template · Free JHA generator · Best JHA software 2026
Questions
- Who is this JHA software for?
- US contractors and field-service teams from owner-operators to around 100 people — electrical, HVAC, roofing, excavation, welding, facilities and similar trades. It is not an enterprise EHS suite for corporate safety departments.
- Is a JHA the same as a JSA?
- Same job-step workflow. Set your organisation label to JHA or JSA; PDFs and share screens follow that name. See our JSA software page if your GC asks for a JSA.
- Does OSHA require this exact form?
- No. OSHA does not mandate a single universal JHA template. OSHA 3071 describes the method — steps, hazards, controls — applied to this job. SafeForJob is not OSHA-certified.
- Can I bring JHAs I already have?
- Start free on a live job in the generator. Paid plans unlock higher monthly limits and bringing existing content into a reusable company library after review — nothing is added blindly.
- Does the software make my JHA compliant?
- No software can guarantee that. It helps you structure a job-specific analysis. You confirm every control against the actual site, energy sources and crew.