RAMS software
RAMS software that feels faster than Word
Describe the job, reuse what your company already knows, catch copy-and-paste mistakes and get RAMS onto your team's phones. Self-serve, from £19 a month.
Almost ready.
- Client confirmed
- Site confirmed
- 7 risks reviewed
Check these
- Previous client name detected“Harbourside Hotel” found in the methodReplace
- Emergency arrangements missingNearest A&E and assembly point not addedAdd details
- SDS has changedCoil cleaner — new SDS revision uploadedReview
- One risk still needs reviewManual handlingReview
Bring the RAMS you already have.
The fastest RAMS is the one you've mostly written before. Import on Pro or Business, review every item, then reuse the good parts.
Your old files
- Harbourside-Hotel-RAMS.docx
- Ashdown-Offices-RAMS-v3.pdf
- Roof-AC-template-OLD.docx
We found reusable content.
- hazards
- 17
- hazards
- controls
- 43
- controls
- method steps
- 12
- method steps
- PPE items
- 6
- PPE items
Control
Needs reviewUse suitable access equipment inspected before use.
Found in 6 documents
Your company library
- Working at height8 docs
- Electrical isolation7 docs
- Hot works5 docs
- Manual handling9 docs
Next RAMS built from your own content.
Example figures. Import is assistive — you confirm each hazard, control and method step before it enters your library.
COSHH software
COSHH assessments next to the RAMS that uses them.
Hazardous substances show up in the method statement — sealants, coil cleaners, cement, silica dust. Keep the COSHH assessment with the job instead of in a separate folder.
- Start from a Safety Data Sheet — key fields are read in your browser — or from dust and fumes with no SDS.
- Answer how your team actually uses the substance: task, quantity, frequency, who is exposed.
- Controls drafted in order (remove or substitute first, PPE last), marked Needs review until you confirm.
- An SDS isn't a COSHH assessment — the tool doesn't treat an uploaded SDS as one.
- Keep COSHH with the RAMS it supports; SDS attachments on Pro and above (see pricing).
- Try the free COSHH generator · COSHH assessment template · SDS vs COSHH
What you get — and what you don't
- Job-first RAMS with explainable suggestions
- COSHH from Safety Data Sheets, and for dust and fumes
- Company library built from content you approve
- RAMS Check before issue
- Revision control and superseded warnings
- Phone view with acknowledgements, no worker accounts
- Published monthly pricing, no setup fee
- Not an enterprise EHS platform
- No chatbot to wrestle with
- No compliance guarantees — you stay in control
Kennet Retail Park
RAMS · Issued 14 Oct 2026
- About this job
- Main risks
- Method
- COSHH
- Emergency information
No account needed
Simple pricing
Free
Try it on a real job.
£0 forever
- 2 RAMS a month
- 1 active project
- Standard PDF
- Basic library
Starter
For sole traders and small teams.
£19 /month
- 10 RAMS a month
- COSHH assessments
- Your logo and company details
- Company library
- Worker acknowledgements
Pro
For growing contractors.
£39 /month
- Generous RAMS allowance
- COSHH assessments and SDS attachments
- Import your existing RAMS (review required)
- Revision history
- Share links for crew acknowledgement
- Client links
- 3 office users
Business
For larger teams.
£79 /month
- 10 office users
- Permissions
- Custom templates
- Audit log
- Higher import and volume limits
- Priority support
Prices exclude VAT. Start free with no card. Upgrade when you need more volume or import. Monthly plans. Cancel any time.
Questions
- Is this a RAMS app or RAMS software?
- Both phrases mean the same product here — a browser-based RAMS and COSHH tool for UK contractors. No separate mobile app install is required; phone share links work for crew acknowledgements.
- Who is this RAMS software for?
- Contractors and field-service businesses from sole traders to around 100 people — electricians, HVAC, plumbing, M&E, roofing, fit-out, fire & security, groundworks, facilities and more. It isn't designed for enterprise H&S departments or principal contractors managing whole sites.
- Do I need a demo or a contract?
- No. Prices are published, plans are monthly and you can start free without a card.
- Can I bring my existing RAMS?
- On Pro and Business, paste or upload RAMS content you already use. We help extract reusable hazards, controls and method steps for you to review into your company library — nothing is added blindly. Free plans create new job-specific RAMS without import.
- Does it include COSHH software?
- Yes — COSHH assessments sit alongside RAMS. Upload a Safety Data Sheet and the key fields are read in your browser, or assess dust and fumes with no SDS. You answer how your team uses the substance and review the draft. An SDS is not a COSHH assessment, so the tool never treats an uploaded SDS as one. Plan limits and which plans include SDS attachments are on the pricing page. You review everything before issue; it doesn't guarantee compliance.
- Does it make my RAMS compliant?
- No software can guarantee that. It helps you create clear, site-specific documents based on the information you provide, and flags common gaps. You review everything before issue.