Import
Bring your existing RAMS
On Pro or Business, bring documents you already use. We'll help turn the useful parts into a reusable company library — after you review each item.
Controls · Electrical isolation
Used by your company
- Lock-off procedure with personal padlocksUsed in 14 previous RAMS
- Prove dead with approved voltage indicatorUsed in 14 previous RAMS
System suggestion
Establish exclusion zone around the distribution board
- hazards
- 28
- hazards
- controls
- 71
- controls
- steps
- 19
- steps
- substances
- 14
- substances
How import works
Your old files
- Harbourside-Hotel-RAMS.docx
- Ashdown-Offices-RAMS-v3.pdf
- Roof-AC-template-OLD.docx
We found reusable content.
- hazards
- 17
- hazards
- controls
- 43
- controls
- method steps
- 12
- method steps
- PPE items
- 6
- PPE items
Control
Needs reviewUse suitable access equipment inspected before use.
Found in 6 documents
Your company library
- Working at height8 docs
- Electrical isolation7 docs
- Hot works5 docs
- Manual handling9 docs
Next RAMS built from your own content.
- 1
Bring your content
Paste from existing RAMS or upload files you already use — Pro and Business.
- 2
Review what we found
Hazards, controls, method steps and PPE for you to accept or edit. Nothing enters the library blindly.
- 3
Build from your library
Your next RAMS starts with the controls your company already uses, after you approved them.
- Nothing goes into your library until you've reviewed it
- Client and site names are stripped from reusable content
- Your original files are kept as the source
- Import more documents any time
Questions
- What can I bring in?
- Paste text from existing RAMS or upload files you already use. Text-based Word (.docx) and PDF work best; scanned paper may need retyping. Import is assistive — you review every extracted item.
- Is everything imported automatically?
- No. We show you what we found — each hazard, control and method step — and you choose what goes into your library. Nothing is added blindly.
- Will old client names come across?
- Client and site names are stripped from library items, and the RAMS Check flags any that slip through when you create a new RAMS.
- Which plan includes import?
- Importing existing RAMS is included in Pro (£39/month) and Business. Start free without a card, then upgrade when you need import.