Skip to content
SafeForJob

Free tool

Free SDS reader

Drop a Safety Data Sheet and see what matters: product, hazards, PPE, first aid and storage. Then turn it into a COSHH assessment.

Read in your browser. Your file isn't uploaded.

Drop a Safety Data Sheet (PDF)

Read in your browser. The file isn't uploaded to us.

What the reader looks for

Safety Data Sheets follow a standard 16-section layout. The reader pulls out the sections you need day to day:

  • Section 1 — product name, supplier and revision date
  • Section 2 — signal word and hazard statements (H-codes), shown with plain-English wording
  • Section 4 — first aid for breathing in, skin, eyes and swallowing
  • Section 6 and 13 — spill response and disposal
  • Section 7 — storage conditions
  • Section 8 — exposure limits and PPE (gloves, eyes, respiratory, skin)

Hazard codes are taken from section 2 only. Ingredient classifications in section 3 and lists in section 16 aren't the classification of the product itself, so they're ignored.

From SDS to COSHH assessment

Once you've checked what we found, answer six short questions — what you use it for, where, how, how much, how often and who could be exposed — and we'll draft a COSHH assessment with controls in order: remove or substitute first, then ventilation and safe systems of work, with PPE last. It's marked Needs review until you've checked it.

Questions

Is a Safety Data Sheet a COSHH assessment?
No. The SDS tells you about the substance's hazards and how the supplier recommends handling it. A COSHH assessment applies that to your work: how you use it, how much, how often, who could be exposed and the controls you'll use. HSE describes the steps in its COSHH assessment guidance.
Is my file uploaded?
No. The PDF is read by your browser on your device. Nothing is sent to our servers unless you choose to save an assessment to an account.
Why couldn't it read my SDS?
Scanned SDSs are images rather than text, so there's nothing for the reader to extract. You can still create a COSHH assessment by entering the key details manually.
Which SDS formats work?
Text-based PDFs in the standard 16-section format used for GB and EU Safety Data Sheets work best.