RAMS and COSHH for UK contractors
Site-specific RAMS in minutes
Describe the job, review the risks and create professional RAMS and COSHH documents without rebuilding everything from scratch.
Built for UK contractors and field teams. No account needed to start free.
Suggested
Switch without starting again
Already have RAMS? Don't start again.
On Pro or Business, bring the RAMS you already use. We help extract hazards, controls and method steps; you review every item before it enters your company library.
Your old files
- Harbourside-Hotel-RAMS.docx
- Ashdown-Offices-RAMS-v3.pdf
- Roof-AC-template-OLD.docx
We found reusable content.
- hazards
- 17
- hazards
- controls
- 43
- controls
- method steps
- 12
- method steps
- PPE items
- 6
- PPE items
Control
Needs reviewUse suitable access equipment inspected before use.
Found in 6 documents
Your company library
- Working at height8 docs
- Electrical isolation7 docs
- Hot works5 docs
- Manual handling9 docs
Next RAMS built from your own content.
Example figures. Import is assistive and gated to paid plans. Nothing is added to your library until you review it.
How it works
Three steps. No forms.
How it works
- 1
Tell us about the job
Describe the work, paste the client's email or upload the scope of works.
- 2
Review what matters
Confirm the activities, risks, controls, method and COSHH. Every suggestion shows why it's there.
- 3
Send your RAMS
Create a professional PDF, send it and collect acknowledgements from your team.
COSHH
From SDS to COSHH assessment.
A Safety Data Sheet provides important information, but it isn't itself your COSHH assessment. Upload the SDS, add how your team actually uses the substance, and review the assessment.
- Reads product, hazards, PPE, first aid and storage from the SDS
- Six quick questions about how you use it
- Covers dust, fumes and mist with no SDS too
PU-construction-adhesive-SDS.pdf
Read in your browser — never uploaded
We found:
- Product
- PU construction adhesive
- SDS date
- 12 June 2026
- Signal word
- Danger
- Hazards
- H317 · H334 · H351
- PPE
- Nitrile gloves, glasses
- First aid
- 4 routes found
This comes from the SDS. It isn't yet a COSHH assessment.
How do you use it?
COSHH assessment
PU construction adhesive · bonding panels indoors
RAMS Check
Catch the things copying and pasting misses.
Before you send anything, we check that the RAMS reflects this job — not the last one. Every issue comes with a button to fix it.
- Old client and site names left in the text
- Methods that are almost identical to your last RAMS
- Missing emergency arrangements
- Risks that still rely only on PPE
Almost ready.
- Client confirmed
- Site confirmed
- 7 risks reviewed
Check these
- Previous client name detected“Harbourside Hotel” found in the methodReplace
- Emergency arrangements missingNearest A&E and assembly point not addedAdd details
- SDS has changedCoil cleaner — new SDS revision uploadedReview
- One risk still needs reviewManual handlingReview
Company library
Every RAMS makes the next one easier.
Reuse your own reviewed company content rather than starting from a blank template every time. Controls your team already trusts appear first.
Controls · Electrical isolation
Used by your company
- Lock-off procedure with personal padlocksUsed in 14 previous RAMS
- Prove dead with approved voltage indicatorUsed in 14 previous RAMS
System suggestion
- hazards
- 28
- hazards
- controls
- 71
- controls
- steps
- 19
- steps
- substances
- 14
- substances
For the team on site
RAMS where the work happens.
Team members open the latest RAMS from their phone, read the main risks and method, and confirm they've read it — without creating an account. If they open an old revision, they're told a newer one exists.
Kennet Retail Park
RAMS · Issued 14 Oct 2026
- About this job
- Main risks
- Method
- COSHH
- Emergency information
No account needed
Who it's for
Made for trades, not H&S departments.
Small contractors and field-service teams from sole traders to around 100 people.
Trades
The difference
Less copying. Less rewriting. Better RAMS.
Old way compared with our way
The usual way
- 1 Find an old RAMS
- 2 Duplicate the Word file
- 3 Replace the client
- 4 Replace the site
- 5 Edit the risk table
- 6 Search for the SDS
- 7 Attach the PDFs
- 8 Export
- 9 Email
- 10 Hope nothing old remains
With SafeForJob
- 1 Describe the job
- 2 Review suggestions
- 3 Reuse approved content
- 4 Attach current COSHH
- 5 Run the check
- 6 Send
Built around how UK contractors actually prepare RAMS.
No badges, no claims we can't back up. Just a clearer way to produce documents you're responsible for.
Trust
You stay in control
Every suggestion is marked Suggested until you confirm it. Nothing is issued without your review.
Clear provenance
See why each suggestion appeared, and which SDS revision a COSHH assessment came from.
Private by default
The free tools read your files in your browser. They aren't uploaded to us.
Documents you'd be proud to send
Clean A4 output with revision control, page numbers and an acknowledgement page.
We help you create and structure RAMS. For what the law requires, see HSE's guidance on managing risks and risk assessment and COSHH assessment.
Pricing
Start free. Upgrade when it's saving you time.
Pricing
Starter
For sole traders and small teams.
£19 /month
Sole traders sending a few RAMS a month.
Pro
For growing contractors.
£39 /month
Companies regularly creating RAMS for multiple sites.
Business
For larger teams.
£79 /month
Teams with an office manager and several people preparing RAMS.
Prices exclude VAT. Start free with no card. Upgrade when you need more volume or import. Monthly plans. Cancel any time.
Got a RAMS to send tonight?
Describe the job and see what we suggest. No account needed until you want to save it.