Facilities maintenance RAMS

Create a site-specific facilities maintenance RAMS online. Describe the job, review suggested risks and method steps, and download a professional PDF.

Typical scope

  • PPM plantroom tasks
  • Reactive leaks
  • Lamp changes at height
  • Roof inspections
  • Water hygiene tasks
  • Contractor escorting

FM RAMS fail when they try to cover every possible reactive task in one vague document. Scope the task or task group.

Quick answer

An FM/PPM RAMS covers reactive and planned tasks in live buildings — plantrooms, roofs, public areas — with permits, lone working and building occupant interfaces.

Primary topic: ppm method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • One RAMS for all PPM

    Too vague to brief anyone.

  • Lone working default

    Check-in arrangements missing.

  • Tenant surprise

    Works in occupied hours without notice.

Example

Quarterly rooftop plant PPM

Built from one job description. You review and adjust every item before issuing it.

Job description

Quarterly service of rooftop condensers at Plaza Offices. Roof access permit, fall restraint where required, electrical isolation of each unit during service, tenants notified of short noise.

Activities identified

  • General site work
  • Roof work
  • Electrical isolation
  • Refrigerant handling
  • Manual handling
  • Occupied premises or public areas

Method (15 steps)

  1. 1.Arrive and sign in. Arrive at Plaza Offices roof, report to the Plaza Offices FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
  5. 5.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  6. 6.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
  7. 7.Recover refrigerant. Recover the refrigerant into a correctly rated, labelled recovery cylinder. Record quantities in line with F-gas requirements.
  8. 8.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  9. 9.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  10. 10.Pressure test and evacuate. Pressure test with oxygen-free nitrogen, then evacuate the system before charging.
  11. 11.Charge the system. Charge the system with refrigerant to the manufacturer's specification and leak test all joints.
  12. 12.Test and commission. Test and commission the installation. Record results.
  13. 13.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  14. 14.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  15. 15.Hand over and sign out. Hand over to the Plaza Offices FM site contact, report anything outstanding and sign out.

Main risks (9 in total)

Fall from roof edge

Residual Medium

Who: Operatives

  • Plan work to be done from below or from a MEWP where possible
  • Edge protection (guard rails) or parapet of adequate height in place before work starts
  • Safe access route to the roof agreed with the site; roof hatch secured open
  • Where collective protection isn't possible, use a fall-restraint system with suitable anchors
  • Work stops in high winds, ice or heavy rain

Fall through fragile roof or rooflight

Residual Medium

Who: Operatives

  • Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
  • Rooflights covered or protected with suitable mesh or barriers
  • Staging or crawling boards used; no walking directly on sheets
  • Safety netting or fall arrest below where required

Falling objects

Residual Low

Who: People below, other trades, public

  • Exclusion zone set up below the work area with barriers and signage
  • Tools tethered when working at height; materials kept away from edges
  • Banksman or second person controls the area during lifts and removals
  • Hard hats worn in the exclusion zone

Adverse weather

Residual Low

Who: Operatives

  • Forecast checked before work; work at height stopped in high winds
  • Breaks, water and shade in hot weather; warm clothing in cold
  • Sun protection on exposed work in summer

+ 5 more risks in the full RAMS.

What to get right on this document

Task scoping

Define the PPM/reactive class this RAMS covers.

Building permits

Permit-to-work integration.

Occupant communication

Notice, exclusion, reinstatement.

Quick answer

An FM/PPM RAMS covers reactive and planned tasks in live buildings — plantrooms, roofs, public areas — with permits, lone working and building occupant interfaces.

What good looks like on a UK site

FM RAMS fail when they try to cover every possible reactive task in one vague document. Scope the task or task group. Name the site, the people at risk, and the sequence that keeps them safe. Generic paragraphs that could apply anywhere are the first thing a principal contractor rejects.

How SafeForJob helps

  • Describe the job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer ppm method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by trade · RAMS by trade · Free RAMS generator

Questions

Reactive vs PPM?
Reactive often needs a short dynamic assessment on top of a core RAMS.
Water hygiene?
Link to legionella procedures and COSHH for chemicals.
Multi-site FM?
Keep site-specific details — don't issue a group-wide identical RAMS.