Skip to content
SafeForJob

Import

Bring your existing JHAs

On Pro or Business, bring analyses you already use. We help turn the useful parts into a reusable company library — after you review each item.

Controls · Lockout / tagout

Used by your company

  • Lockout with personal padlocks and try-startUsed in 14 previous JHAs
  • Prove absence of voltage with a known-live testerUsed in 14 previous JHAs

System suggestion

Establish a drop zone on the occupied floor below
hazards
28
hazards
controls
71
controls
steps
19
steps
chemicals
14
chemicals

How import works

Your old files

  • Westfield-Warehouse-JHA.docx
  • Phoenix-Clinic-RTU-JHA-v3.pdf
  • Roof-HVAC-template-OLD.docx

We found reusable content.

hazards
17
hazards
controls
43
controls
job steps
12
job steps
PPE items
6
PPE items

Control

Needs review

Inspect anchorage and connect before approaching the edge.

Found in 6 documents

Your company library

  • Fall protection8 docs
  • Lockout / tagout7 docs
  • Hot work5 docs
  • Manual handling9 docs

Next JHA built from your own content.

  1. 1

    Bring your content

    Paste from existing JHAs/JSAs or upload files you already use — Pro and Business.

  2. 2

    Review what we found

    Hazards, controls, job steps and PPE for you to accept or edit. Nothing enters the library blindly.

  3. 3

    Build from your library

    Your next JHA starts with controls your company already uses, after you approved them.

  • Nothing goes into your library until you've reviewed it
  • Client and site names are stripped from reusable content where possible
  • Prefer JSA wording? Same import — set your organisation label after signup
  • Or start free on a live job with no import

See JHA software · US pricing · Free JHA generator

Questions

What can I bring in?
Paste text from existing JHAs or JSAs, or upload files you already use. Text-based Word (.docx) and PDF work best; scanned paper may need retyping. Import is assistive — you review every extracted item.
Is everything imported automatically?
No. We show what we found — each hazard, control and job step — and you choose what goes into your library. Nothing is added blindly.
Will old client or site names come across?
Client and site names are stripped from library items where possible, and checks before issue flag leftovers on the next job.
Which plan includes import?
Import is on Pro ($49/month) and Business. Start free without a card, then upgrade when you need a company library from existing files.