Free COSHH template
COSHH assessment template
Upload a Safety Data Sheet, tell us how you use the substance, and get a COSHH assessment to review. Works for dust and fumes with no SDS too.
PU-construction-adhesive-SDS.pdf
Read in your browser — never uploaded
We found:
- Product
- PU construction adhesive
- SDS date
- 12 June 2026
- Signal word
- Danger
- Hazards
- H317 · H334 · H351
- PPE
- Nitrile gloves, glasses
- First aid
- 4 routes found
This comes from the SDS. It isn't yet a COSHH assessment.
How do you use it?
COSHH assessment
PU construction adhesive · bonding panels indoors
What a COSHH assessment covers
- The substance — product, supplier and SDS revision date
- The hazards — signal word, hazard statements and pictograms (SDS section 2)
- How it's used — task, location, method, quantity and frequency
- Who could be exposed and how — breathing in, skin, eyes, swallowing
- Controls — in order, with PPE last (SDS section 8 for PPE detail)
- Storage, first aid, spills and disposal — SDS sections 7, 4, 6 and 13
- Health surveillance — where the substance can cause asthma, dermatitis or long-term disease
- Review — when the SDS changes, the work changes or after an incident
Common construction examples
Sealants and PU adhesives (often skin and respiratory sensitisers), coil cleaners (often corrosive), refrigerants (gas under pressure, some flammable), cement and mortar (skin burns), solvent-based paints, and dust from cutting concrete, brick or timber. The generator includes ready-made starting points for silica dust, wood dust, welding fume, solder fume, paint mist, diesel exhaust and insulation fibres.
From template to COSHH software
A blank form is fine for one product. It gets slow when the same substances keep turning up across jobs and each RAMS needs its COSHH attached. The RAMS and COSHH software lets you create COSHH assessments from an SDS or for dust and fumes, keep them with the RAMS that references them, and reuse what you have already approved. Check pricing for plan limits.
An SDS is an input, not the assessment — see SDS vs COSHH assessment. Generated drafts need your review, and no tool can guarantee compliance.
Questions
- What is a COSHH assessment?
- An assessment under the Control of Substances Hazardous to Health Regulations 2002 of how a hazardous substance is used at work, who could be harmed and how, and the controls in place. It covers substances generated by work — dust and fumes — as well as products with a Safety Data Sheet.
- Do I need a COSHH assessment for every product?
- You need to assess the risks from hazardous substances your work involves. Products that aren't classified as hazardous usually need little more than following the supplier's instructions. HSE's COSHH guidance explains the approach.
- Can I just attach the Safety Data Sheet?
- An SDS is an important input but isn't your COSHH assessment. The assessment adds how your team actually uses the substance and the controls you'll use.
- Is there COSHH software, or just a template?
- Both. The free COSHH generator needs no account: upload an SDS or choose dust or fumes, answer how you use the substance, and review the draft. If you want COSHH assessments kept with your RAMS, a company library and revision history, that's what the RAMS and COSHH software is for. Neither replaces your judgement — the draft is marked Needs review.
- Which controls come first?
- Remove or substitute the substance if you can, then change the process, use ventilation or extraction and safe systems of work. HSE advises not to automatically opt for PPE.