Blank COSHH assessment template
COSHH assessment
| Substance / product | |
|---|---|
| Supplier and SDS revision date | |
| Task / use | |
| Location (indoors / outdoors) | |
| How used, how much, how often | |
| Who could be exposed | |
| Assessor / date |
1. Hazards
Signal word, hazard statements (H-codes) and pictograms from section 2 of the SDS.
2. How people could be exposed
Breathing in, skin contact, eye contact, swallowing.
3. Controls
Remove or substitute first; then ventilation/extraction and safe systems of work; PPE last.
4. PPE
Gloves (type), eye protection, RPE (type and face-fit), clothing — from section 8 of the SDS.
5. Storage
From section 7 of the SDS.
6. First aid
From section 4 of the SDS.
7. Spills and disposal
From sections 6 and 13 of the SDS.
8. Health surveillance
Needed? (e.g. sensitisers, silica)
Review
| Next review date | |
|---|---|
| Reviewed by |
Blank template from SafeForJob. Create one from an SDS at www.safeforjob.com/coshh-assessment-generator