Concrete JHA

Concrete JHAs that only mention PPE miss the silica table, the pump hose, and the overnight cure with open edges. Cutting existing slab in an occupied store is a different job from a greenfield pour.

Typical scope

  • Silica method
  • Pump or buggy path
  • Skin wash station
  • Edge and blockout covers
  • Truck spotting
  • Cure signs

Quick answer

A concrete JHA is a job-specific analysis for placing, finishing, cutting, or repairing concrete. It should cover silica from cutting, wet-concrete skin exposure, pump or buggy traffic, and how the pour is isolated from the public.

Primary topic: concrete jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.

What usually goes wrong

These are the operational gaps that make a generic Word JHA fail on the next job.

  • Dry cutting 'just a little'

    A 12-inch saw in a store aisle with no water.

  • No wash station

    Finishers in wet concrete all afternoon.

  • Boom over the sidewalk

    No spotter, no exclusion.

Example

Interior slab saw-cut and patch in a grocery

Built from one job description. You review and adjust every item before issuing it.

Southern Concrete Repair · Buckhead grocery, Atlanta, Georgia

Saw-cut and patch a 4x8 trench in an occupied grocery in Atlanta after close. Wet-cut with HEPA vac, keep the public aisle taped, place high-early mix, and plate the patch before doors open.

What to get right on this document

Name the silica control

Water, LEV, or both — matching 29 CFR 1926.1153.

Name the placement method

Pump, buggy, or chute.

Name overnight protection

Edges, blockouts, and wet signs.

What this JHA has to cover

Concrete JHAs that only mention PPE miss the silica table, the pump hose, and the overnight cure with open edges. Cutting existing slab in an occupied store is a different job from a greenfield pour.

A concrete jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.

Typical hazards to analyze on this job

  • Silica dust from saw-cutting without water or LEV
  • Skin burns from wet concrete and cement
  • Struck-by from the pump hose, boom, or ready-mix truck
  • Falls at unguarded slab edges or blockouts
  • Caught-in at the mixer or buggy
  • Chemical exposure from curing compounds and form oil

Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.

A job sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.

  • Barricade the pour or cut; brief truck and pump traffic
  • Set silica controls (water, LEV, or both) before a blade spins
  • Place with a designated hose crew and exclusion under the boom
  • Finish without walking unprotected edges; cover blockouts as you go
  • Wash skin promptly; keep a clean-water station
  • Leave the slab with edges protected and wet-floor or cure signs posted

Other people in the area

Retail and school pours happen next to the public. Keep a spotter at the sidewalk, do not wet-cut into a storm drain, and never leave a blockout uncovered overnight.

Chemicals, dust, and SDS inputs

An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:

  • Portland cement and wet concrete
  • Curing compounds
  • Silica from cutting existing slab

How SafeForJob helps

  • Describe this job in plain English and get suggested steps, hazards, and controls
  • Edit every line before you download or issue
  • Reuse a previous JHA and catch old client or site names
  • Share a link so the crew can read the current revision and acknowledge it

What this page is not

This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer concrete jha for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.

Related pages

All jha by trade · JHA by trade · Free JHA generator

Questions

Is Table 1 enough?
Table 1 in the silica standard is a starting method. The JHA still names this saw, this room, and this occupancy.
Do I need a JHA for a small patch?
If you cut, pump, or work at an open edge, yes. Keep it proportional.
What about winter additives?
Write them. They change skin and chemical exposure.
Who spots the truck?
A named person with a radio, not 'whoever is free'.