Silica concrete cutting JHA
A generic concrete JHA says 'wear a mask'. This job is the saw, the indoor plume, and the night crew in the next grocery aisle.
Typical scope
- Tool named
- Water/LEV on first
- Helper exclusion
- HVAC isolation
- No dry sweep
- Slurry drum
Quick answer
A silica cutting JHA names the tool, the 1926.1153 method (water, LEV, or both), who is in the plume, housekeeping, and slurry disposal for cutting concrete, masonry, or similar.
Primary topic: silica cutting jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.
What usually goes wrong
These are the operational gaps that make a generic Word JHA fail on the next job.
Five-minute dry cut
Still silica.
Table 1 in the truck
Dry saw on the floor.
Drain the dock
Illegal slurry.
Example
Wet-cut grocery trench
Built from one job description. You review and adjust every item before issuing it.
Southern Concrete Repair · Buckhead grocery, Atlanta
Atlanta grocery after close, water on the walk-behind, HEPA vac, aisle taped, returns blocked, slurry drummed, plate before doors open.
What to get right on this document
Name this saw
Walk-behind, hand-held, or core.
Occupants breathe too
Write HVAC.
Method before blade
Not after you see dust.
What this JHA has to cover
A generic concrete JHA says 'wear a mask'. This job is the saw, the indoor plume, and the night crew in the next grocery aisle.
A silica cutting jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.
Typical hazards to analyze on this job
- Respirable crystalline silica from a dry blade
- Helper in the plume with no protection
- Indoor HVAC spreading dust to occupants
- Kickback or blade failure
- Slurry in a storm drain
- Noise in an occupied store
Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.
A job sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.
- Name material and tool; pick the matching method
- Set water or LEV and the occupancy barrier before the blade spins
- Cut with helpers out of the plume
- Housekeep wet or HEPA — no dry sweep
- Drum slurry legally
- Release the area after dust has settled and HVAC is checked
Other people in the area
Night grocery cuts still have restock crews. Tape the next aisle. Block returns if you are indoors.
Chemicals, dust, and SDS inputs
An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:
- Silica dust
- Slurry
- Curing compounds if pouring the same night
How SafeForJob helps
- Describe this job in plain English and get suggested steps, hazards, and controls
- Edit every line before you download or issue
- Reuse a previous JHA and catch old client or site names
- Share a link so the crew can read the current revision and acknowledge it
What this page is not
This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer silica cutting jha for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.
Related pages
- JHA by tradeConcrete JHACreate a concrete jha for a named US job. Covers silica dust from saw-cutting without water or lev, the order of work, and who else is in the area. Review before issue — not OSHA certified.
- JHA by jobRebar tying JHAWrite a job-specific rebar tying jha covering impalement on unprotected dowels. Review steps, occupancy and controls before you issue. Not an OSHA form.
- GuidesSilica on a JHAWhen you cut, grind, or drill materials that contain crystalline silica, the JHA must name the tool, the method (water, LEV, or both), housekeeping, and who…
- JHA by jobRooftop HVAC replacement JHAWrite a job-specific rooftop hvac jha covering fall from the eave or open curb. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobLockout/tagout JHAWrite a job-specific lockout tagout jha covering unexpected startup. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobTrenching JHAWrite a job-specific trenching jha covering cave-in of unsupported walls. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobScissor lift JHAWrite a job-specific scissor lift jha covering tip-over on a grade, grate, or debris. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobBoom lift JHAWrite a job-specific boom lift jha covering electrocution from overhead lines. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobExtension ladder JHAWrite a job-specific extension ladder jha covering fall from a mis-set or overloaded ladder. Review steps, occupancy and controls before you issue. Not an OSHA form.
Questions
- Is Table 1 enough?
- If you use it, use it fully. The JHA still names this room.
- Respirator instead of water?
- PPE is residual.
- Outdoor cuts?
- Water or LEV still belong.
- Tile saws?
- Ceramic and porcelain often contain silica — wet-cut them too.