JHA by job · US
Extension ladder JHA
Ladder JHAs are treated as too simple to write. Falls still happen on 24-foot extensions set on ice, on doors that open, and on the top cap used as a step.
Typical scope
- Duty rating
- 4-to-1 setup
- Tie-off
- Base barricade
- Three-point contact
- No top cap
Quick answer
An extension-ladder JHA covers selecting, placing, climbing, and working from a portable ladder — including the 4-to-1 setup, tie-off, three points of contact, and what sits under the landing.
Primary topic: extension ladder jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.
What usually goes wrong
These are the operational gaps that make a generic Word JHA fail on the next job.
A-frame JHA pasted
Stepladder talk on an extension.
Base in a doorway
No spotter.
Metal ladder at a service drop
Power overhead.
Example
24-foot extension to a school roof hatch
Built from one job description. You review and adjust every item before issuing it.
Metro Facilities · Natomas elementary, Sacramento
Fiberglass extension to a gym hatch after hours. Tied at the hatch, spotter at the base during student activity in the next hall, tools hoisted, ladder taken down before morning.
What to get right on this document
Name fiberglass vs metal
Especially near electricity.
Name the landing
Roof, hatch, or ceiling grid.
Spotter in public
Not optional in a corridor.
What this JHA has to cover
Ladder JHAs are treated as too simple to write. Falls still happen on 24-foot extensions set on ice, on doors that open, and on the top cap used as a step.
An extension ladder jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.
Typical hazards to analyze on this job
- Fall from a mis-set or overloaded ladder
- Ladder kicked out at the base in a public corridor
- Contact with overhead power on a metal ladder
- Door opening under the landing
- Carrying tools that break three-point contact
- Using the top cap as a step
Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.
A job sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.
- Choose the right length and duty rating; inspect rails and feet
- Set 4-to-1 on firm, level support; tie off at the top when you can
- Barricade the base in public or doorway locations
- Face the ladder, three points of contact, tools on a belt or hoist line
- Do not stand on the top cap or the last usable rung
- Take it down or secure it before leaving
Other people in the area
School and hospital corridors will walk through a ladder. A spotter at the base is occupancy. Never leave an extension ladder standing in a hallway at lunch.
Chemicals, dust, and SDS inputs
An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:
- Paint or wet from the task
- Metal ladder vs electrical work (use fiberglass)
- Ice-melt chemicals at winter entries
How SafeForJob helps
- Describe this job in plain English and get suggested steps, hazards, and controls
- Edit every line before you download or issue
- Reuse a previous JHA and catch old client or site names
- Share a link so the crew can read the current revision and acknowledge it
What this page is not
This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer extension ladder jha for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.
Related pages
- JHA by tradeGeneral contractor JHACreate a general contractor jha for a named US job. Covers trade-on-trade struck-by in a shared corridor or shaft, the order of work, and who else is in the area. Review before issue — not OSHA certified.
- JHA by jobScissor lift JHAWrite a job-specific scissor lift jha covering tip-over on a grade, grate, or debris. Review steps, occupancy and controls before you issue. Not an OSHA form.
- GuidesWhen to update a JHAUpdate a JHA when the job, location, energy sources, occupancy, weather, or crew competence changes in a way that makes yesterday's controls untrue. Reuse th…
- JHA by jobRooftop HVAC replacement JHAWrite a job-specific rooftop hvac jha covering fall from the eave or open curb. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobLockout/tagout JHAWrite a job-specific lockout tagout jha covering unexpected startup. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobTrenching JHAWrite a job-specific trenching jha covering cave-in of unsupported walls. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobBoom lift JHAWrite a job-specific boom lift jha covering electrocution from overhead lines. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobRoofing tear-off JHAWrite a job-specific roofing tear off jha covering fall through a hidden hole or skylight. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobHot work welding JHAWrite a job-specific hot work jha covering fire in a concealed space. Review steps, occupancy and controls before you issue. Not an OSHA form.
Questions
- Is a JHA overkill for a ladder?
- Not when the landing is a roof, a live corridor, or near power.
- What is 4-to-1?
- One foot out for every four feet of working height to the top support.
- Can I use an extension as a stepladder?
- No. Write the right ladder.
- Who inspects?
- The user, every time, plus a damaged-tag rule.