Skip to content
SafeForJob

Guides · US

A competent person reviews and issues a JHA

People search ‘who signs a JHA’. We stay honest: we do not appoint your competent person, and we do not endorse the pack.

On this page

  • Draft vs issued
  • Person reviews
  • Version frozen
  • Crew briefed
  • History kept
  • Re-review on change

Quick answer

Review means a person who understands the work checks that the lockout, occupancy and chemicals match this job, then freezes an issued version.

Primary topic: who reviews a jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.

What usually goes wrong

These are the operational gaps that make a generic Word JHA fail on the next job.

  • Unreviewed download

    Not issued.

  • Software as approval

    False.

  • No brief

    Crew never saw it.

What to get right on this document

Issue is a person

Not a button.

Competence is this job

Not a logo.

No endorsement

You remain responsible.

What this JHA has to cover

People search ‘who signs a JHA’. We stay honest: we do not appoint your competent person, and we do not endorse the pack.

A who reviews a jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.

Typical hazards to analyze on this job

  • Issued at 06:50 unreviewed
  • AI output treated as a certificate
  • Reviewer who has never seen the site
  • Draft and issued mixed
  • No brief after issue
  • Client told the software approved it

Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.

A job sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.

  • Draft from a job description
  • Competent person edits lockouts, occupancy and chemicals
  • Issue a frozen version
  • Brief and acknowledge
  • Do not overwrite history
  • Review again when the job changes

Other people in the area

Competence is about this site, not a general card on the van. Write this job’s facts into the issued version as occupancy control, not a hope.

Chemicals, dust, and SDS inputs

An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:

  • Chemicals still need a person who understands the task

How SafeForJob helps

  • Describe this job in plain English and get suggested steps, hazards, and controls
  • Edit every line before you download or issue
  • Reuse a previous JHA and catch old client or site names
  • Share a link so the crew can read the current revision and acknowledge it

What this page is not

This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer who reviews a jha for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.

Related pages

All guides · JHA by trade · Free JHA generator

Questions

Does SafeForJob sign the JHA?
No. You review and issue it.
Who is a competent person?
Someone who understands this work enough to judge the pack. This page does not appoint them and is not legal advice.
Can AI issue a JHA?
No. A tool can draft. A person issues.
Is this an OSHA stamp?
No. A reviewed JHA is not an OSHA approval stamp.