Free risk assessment template
Risk assessment template for contractors
A risk assessment is half of a RAMS. Describe the job and the free RAMS generator drafts a site-specific risk assessment and method statement together — suggested hazards and controls for you to review before issue.
| 5 | 10 | 15 | 20 | 25 |
| 4 | 8 | 12 | 16 | 20 |
| 3 | 6 | 9 | 12 | 15 |
| 2 | 4 | 6 | 8 | 10 |
| 1 | 2 | 3 | 4 | 5 |
Severity
Your organisation can configure its preferred matrix. HSE doesn't require one.
The five steps, applied to a job
HSE sets out five steps to managing risk. Here's how they map to what you do in the tool:
- Identify hazards — describe the job; we suggest the activities and hazards involved, each with the reason.
- Assess the risks — confirm who could be harmed and, if you use one, the likelihood and severity.
- Control the risks — tick the controls you'll use, grouped from removing the hazard down to PPE.
- Record your findings — preview a clear document with the risk table and method.
- Review the controls — revisit when the job, site or team changes.
HSE's advice is not to rely purely on paperwork — the point is to control the risks in practice. A clear, job-specific document makes that easier to brief.
Risk assessment is half of a RAMS
A RAMS = Risk Assessment + Method Statement. They answer different questions, and clients usually want both before work starts:
- Risk assessment — what could go wrong, who could be harmed, and the controls you will use.
- Method statement — how the job is done in order: access, isolation, sequence, handover, emergency arrangements.
A risk table that never says when a control applies is easy to ignore on site. Putting the controls into the method steps is what makes the document usable in a toolbox talk.
What the free generator does — and doesn't
- Drafts a risk assessment and method statement from your job description.
- Every hazard, control and step is a suggestion you confirm or change.
- Shows the reason for each suggestion so you can judge it.
- Doesn't guarantee compliance or client acceptance — you stay responsible for the final document.
- Print or save a PDF from the browser when you need a file.
Need the full RAMS layout?
Use the RAMS template when clients ask for risk and method together, or the method statement template for the how-to side on its own.
RAMS template · Method statement template · COSHH assessment template · RAMS software
Questions
- Do I have to write my risk assessment down?
- HSE says employers with five or more employees must record the significant findings: the hazards, who might be harmed and how, and what you're doing to control the risks. Writing it down is good practice for smaller businesses too.
- Is a risk assessment the same as a RAMS?
- No — a risk assessment is half of a RAMS. RAMS stands for Risk Assessment and Method Statement: the risk assessment records hazards, who could be harmed and the controls; the method statement says how the work is done, step by step. Clients and principal contractors often ask for both, so the free generator drafts both together and you review them. See the RAMS template for the full layout.
- Will my client accept a risk assessment on its own?
- It depends on the client. Many contractors and principal contractors ask for a RAMS (risk assessment plus method statement) before work starts. Check the client's or principal contractor's requirements — we can't tell you what a particular client will accept.
- Do I need a 5×5 risk matrix?
- No. HSE doesn't require a scoring matrix. Many contractors and clients use one, so we offer an optional 5×5 likelihood × severity rating that your organisation can change.
- Is this suitable for office or retail risk assessments?
- This tool is built for contractors and field work. For general workplace assessments, HSE publishes its own template and examples.
- Can I download an Excel or Word risk assessment template?
- We focus on a job-specific online draft and a printable blank layout. Reusing a filled Excel or Word file from last month is how old site names and wrong controls survive. Print or save a PDF from your browser when you need a file.