Risk Assessment & Method Statement
| Company | |
|---|
| Project / job | |
|---|
| Client | |
|---|
| Site address | |
|---|
| Start date and duration | |
|---|
| Document number / revision | |
|---|
| Prepared by / date | |
|---|
| Reviewed by / date | |
|---|
1. Scope of work
What is being done, where, how it's accessed and anything specific to this site.
2. Risk assessment
| Hazard | Who could be harmed and how | Controls (remove → substitute → engineering → safe system → PPE) | Before L×S | After L×S |
|---|
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
L = likelihood, S = severity, each 1–5. 1–4 Low · 5–9 Medium · 10–14 High · 15–25 Very high. Use your organisation's own matrix if it has one.
3. Method statement
| Step | What happens, in order (include isolation, access, the work, testing and handover) |
|---|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
4. PPE, equipment and COSHH
| PPE | |
|---|
| Plant and equipment | |
|---|
| Substances (COSHH attached) | |
|---|
| Permits required | |
|---|
5. Emergency arrangements
| First aider | |
|---|
| Nearest A&E | |
|---|
| Fire assembly point | |
|---|
| Emergency contact | |
|---|
6. Briefing and acknowledgement
I confirm that I have read and understood this RAMS and will follow it.
Blank template from SafeForJob. Fill it in faster at www.safeforjob.com/free-rams-generator