A buggy-place JHA misses a boom that can reach a schoolyard and a hose that can kill if it whips. Pumping is a crane-like envelope plus wet concrete.
Typical scope
- Power-line survey
- Outriggers/mats
- Boom exclusion
- Hose-whip rule
- Trained hose crew
- Legal washout
Quick answer
A concrete-pumping JHA covers placing with a boom or line pump: boom envelope, hose whip, overhead power, and people under the boom.
Primary topic: concrete pumping jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.
What usually goes wrong
These are the operational gaps that make a generic Word JHA fail on the next job.
Buggy JHA
No envelope.
Look into the hose
Blockage.
Boom over the playground
No marshal.
Example
Boom pump on a school addition
Built from one job description. You review and adjust every item before issuing it.
Northstar Construction · Northeast Minneapolis elementary
Minneapolis, outriggers on mats, power-line clearance measured, playground closed, trained hose crew, washout in the designated pit, not the street.
What to get right on this document
Measure the lines
A number.
Never look in the hose
Write the blockage steps.
Marshal for the public
Operator cannot do both.
What this JHA has to cover
A buggy-place JHA misses a boom that can reach a schoolyard and a hose that can kill if it whips. Pumping is a crane-like envelope plus wet concrete.
A concrete pumping jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.
Typical hazards to analyze on this job
- Boom contact with power lines
- Hose whip at a blocked line
- Struck-by under the boom
- Tip of the pump truck
- Skin burns from wet concrete
- Silica if you also cut
Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.
A job sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.
- Survey lines and set outriggers on designed mats
- Exclusion under the boom and at the hopper
- Blow-out/blockage procedure — never look into a pressurized hose
- Place with a trained hose crew
- Wash out where it is legal
- Release the exclusion after the boom is in
Other people in the area
School additions and city streets put kids and cars in reach of the boom. Occupancy is a marshal, not the pump operator also watching the sidewalk.
Chemicals, dust, and SDS inputs
An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:
- Wet concrete and cement
- Curing compounds
- Hydraulic fluid
How SafeForJob helps
- Describe this job in plain English and get suggested steps, hazards, and controls
- Edit every line before you download or issue
- Reuse a previous JHA and catch old client or site names
- Share a link so the crew can read the current revision and acknowledge it
What this page is not
This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer concrete pumping jha for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.
Related pages
- JHA by tradeConcrete JHACreate a concrete jha for a named US job. Covers silica dust from saw-cutting without water or lev, the order of work, and who else is in the area. Review before issue — not OSHA certified.
- JHA by jobSilica concrete cutting JHAWrite a job-specific silica cutting jha covering respirable crystalline silica from a dry blade. Review steps, occupancy and controls before you issue. Not an OSHA form.
- GuidesSilica on a JHAWhen you cut, grind, or drill materials that contain crystalline silica, the JHA must name the tool, the method (water, LEV, or both), housekeeping, and who…
- JHA by jobRooftop HVAC replacement JHAWrite a job-specific rooftop hvac jha covering fall from the eave or open curb. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobLockout/tagout JHAWrite a job-specific lockout tagout jha covering unexpected startup. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobTrenching JHAWrite a job-specific trenching jha covering cave-in of unsupported walls. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobScissor lift JHAWrite a job-specific scissor lift jha covering tip-over on a grade, grate, or debris. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobBoom lift JHAWrite a job-specific boom lift jha covering electrocution from overhead lines. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobExtension ladder JHAWrite a job-specific extension ladder jha covering fall from a mis-set or overloaded ladder. Review steps, occupancy and controls before you issue. Not an OSHA form.
Questions
- Line pump vs boom?
- Envelope differs. Do not copy.
- Who signals the boom?
- One person. Write it.
- Blocked line?
- Procedure on the JHA. No hero looking into the hose.
- Overhead lines?
- A measured clearance or a different method.