Method statement · UK
Medical gas works method statement
A compressed-air method is the wrong gas. If the sequence does not name the designated person, identity testing and how a ward is told a terminal is dead, it will fail estates and it should.
Typical scope
- Designated-person permit
- Dead terminals signed
- Identity test before use
- Clinical lead briefed
- Oil-free on oxygen
- Records at handover
Quick answer
A medical-gas method statement is the sequence for altering a named medical gas pipeline: permit, isolation that does not surprise a theatre, identity of gases, and a proven system before use.
Primary topic: medical gas method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Compressed-air method reused
Wrong gas, no identity test.
Terminal looks live, is dead
Clinical surprise.
PTFE from a plumbing bag on oxygen
Incompatible.
Example
Oxygen terminal isolation on a ward
Built from one job description. You review and adjust every item before issuing it.
Job description
Alter two oxygen terminals on Ward C, Witham Day Hospital, Boston. Saturday designated-person permit, terminals signed dead, adjacent bays briefed, identity test before Sunday lists, no plumbing PTFE, estates records updated.
Activities identified
- General site work
- Occupied premises or public areas
- Plumbing and heating systems
Method (8 steps)
- 1.Arrive and sign in. Arrive at Ward C, Witham Day Hospital, Boston, report to the Witham Day Hospital Estates site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Isolate and drain down. Isolate the water/heating supply, allow to cool and drain down the affected section. Confirm isolation before breaking into pipework.
- 5.Install pipework. Install and connect pipework. Use press-fit or mechanical joints in place of hot works where possible.
- 6.Test and commission. Test and commission the installation. Record results.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Witham Day Hospital Estates site contact, report anything outstanding and sign out.
Main risks (3 in total)
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
Hot water, hot surfaces and flooding
Residual LowWho: Operatives, occupants
- System isolated, allowed to cool and drained down before work
- Isolation valves identified and tested before breaking into pipework
- Drip trays, buckets and wet vac available
- Gloves when handling recently isolated pipework
Stored pressure
Residual LowWho: Engineers
- Systems depressurised and drained down before breaking into pipework
- Gauges, hoses and valves inspected and rated for the system pressure
- Cylinders secured upright and transported with valves protected
- Eye protection worn when connecting or venting
What to get right on this document
Identity is the method
Test it.
The clinical lead is occupancy
Tell them.
Oxygen is not compressed air
Oil-free, specified joints.
What this document has to cover
A compressed-air method is the wrong gas. If the sequence does not name the designated person, identity testing and how a ward is told a terminal is dead, it will fail estates and it should.
A medical gas method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Wrong gas at a terminal after work
- Isolation of a live theatre or ward terminal without notice
- Fire or oxygen enrichment
- Work on a pipeline that was not isolated and proved
- Noise or dust into a clinical bay
- Unauthorised use of a terminal during commission
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Designated person agrees the permit, identity of gases and which terminals go down
- Isolate, lock and prove as the permit; signage on every dead terminal
- Work with hot-works and oil-free discipline as the system requires
- Purge and identity-test before anyone asks to use it
- Brief the clinical lead; do not leave an unlabelled live terminal
- Hand over records and remaining defects
Occupancy and other people
Wards and theatres stay in timetable. Write who loses gases, for how long, and that a locum will use a terminal that looks live.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- The medical gases themselves (oil-free discipline on oxygen)
- Jointing materials specified for the system
- Degreasers — only those compatible
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer medical gas method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobMedical gas alteration RAMSCreate a medical gas rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesHow to write a method statementA practical sequence for writing a method statement that a principal contractor will actually read.
- RAMS by tradeM&E RAMSCreate mechanical electrical method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this compressed air?
- No — medical gases have identity and clinical occupancy.
- Who is the designated person?
- Name them — this page is not that appointment.
- Can we hot-work on oxygen pipe?
- Follow the permit and specialist method; default is avoid.
- Nitrous / vacuum?
- Write the actual gases on the permit.