How to write a method statement (UK)

If the only control is ‘PPE will be worn’, you have not written a method.

On this page

  • Order of work
  • Named isolations
  • Occupancy
  • Tests
  • Handover
  • Site names

Quick answer

A method statement is the step-by-step ‘how’ that sits with your risk assessment. Write it so a competent stranger could brief the critical controls in order — isolation before work, test before restore, tidy before leave.

Primary topic: how to write a method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • PPE as the method

    Not a sequence.

  • Last week’s site

    Copied.

  • No restore

    System left unsafe.

What to get right on this document

Critical control first

Not last.

This site

Names.

Restore is a step

Always.

What this document has to cover

If the only control is ‘PPE will be worn’, you have not written a method.

A how to write a method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Critical control buried at the end
  • Copied plot numbers
  • No occupancy
  • No test/restore
  • No waste/handover

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Name the job and site
  • List isolations and permits first
  • Access equipment
  • The work
  • Test and restore
  • Waste and handover

Occupancy and other people

Occupied premises need extra steps: who is briefed, which route stays open.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Attach COSHH where substances appear

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer how to write a method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Method vs RAMS?
RAMS is risk assessment plus method. This page is the method half.
How long should it be?
Long enough that the critical control cannot be skipped — not an essay.
Can software write it?
It can draft. You review.
Legal format?
None mandated — clarity beats decoration.