Water hygiene method statement
Running taps without a list or a scald control is not a scheme.
Typical scope
- Outlet list
- Scheme durations
- Records
- Scald
- Aerosol
- Report defects
Quick answer
A water hygiene method statement is the sequence for flushing, temperature checks or dosing under a legionella scheme. Records at the outlet are part of the method.
Primary topic: water hygiene method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
No list
Random taps.
No records
No proof.
Full spray in a ward
Aerosol.
Example
Weekly flush
Built from one job description. You review and adjust every item before issuing it.
Job description
Little-used outlets, education block, Friday morning before occupancy.
Activities identified
- General site work
Method (4 steps)
- 1.Arrive and sign in. Arrive at Education block, report to the College estates site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 4.Hand over and sign out. Hand over to the College estates site contact, report anything outstanding and sign out.
Main risks (0 in total)
What to get right on this document
List is the method
Named outlets.
Record now
At the outlet.
Aerosol control
How showers are run.
What this document has to cover
Running taps without a list or a scald control is not a scheme.
A water hygiene method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Aerosol
- Scald
- Slips
- Chemicals if dosing
- Plant-room access
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Take the outlet list
- Exclude splash
- Flush/dose as specified
- Record temperature/time
- Dry floors
- Report failures
Occupancy and other people
Do not flush a patient shower while they are in it.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Dosing chemicals if used
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer water hygiene method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobWater hygiene flushing RAMSCreate a water hygiene flushing rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- RAMS by tradeFacilities maintenance RAMSCreate ppm method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this COSHH?
- Dosing yes; flushing water no.
- Tank entry?
- Different method.
- Failed temperature?
- Report, do not tick.
- Who owns the scheme?
- The dutyholder — you follow it.