Water hygiene flushing RAMS

This looks like ‘running taps’ until someone scalds, floods a ward, or enters a confined tank. Write the actual outlets and temperatures.

Typical scope

  • Outlet list
  • Record sheet
  • Scald control
  • Aerosol reduction
  • Dutyholder report
  • Floor dry

Quick answer

A water hygiene flushing RAMS covers flushing little-used outlets to manage legionella risk in occupied buildings. Scald, water damage, COSHH if dosing, and access to plant rooms are typical issues.

Primary topic: water hygiene flushing rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • No outlet list

    People flush ‘some taps’.

  • Shower on full spray in a ward

    Aerosol.

  • Records later

    Never written.

Example

Weekly little-used flush

Built from one job description. You review and adjust every item before issuing it.

Job description

Flush little-used outlets in Block C, City College, Norwich, Friday 07:00. Outlet list attached, showers run with reduced head where specified, temperatures logged, floors dried before students arrive.

Activities identified

  • General site work
  • Plumbing and heating systems

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Block C, City College, Norwich, report to the City College Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate and drain down. Isolate the water/heating supply, allow to cool and drain down the affected section. Confirm isolation before breaking into pipework.
  4. 4.Install pipework. Install and connect pipework. Use press-fit or mechanical joints in place of hot works where possible.
  5. 5.Test and commission. Test and commission the installation. Record results.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the City College Estates site contact, report anything outstanding and sign out.

Main risks (2 in total)

Hot water, hot surfaces and flooding

Residual Low

Who: Operatives, occupants

  • System isolated, allowed to cool and drained down before work
  • Isolation valves identified and tested before breaking into pipework
  • Drip trays, buckets and wet vac available
  • Gloves when handling recently isolated pipework

Stored pressure

Residual Low

Who: Engineers

  • Systems depressurised and drained down before breaking into pipework
  • Gauges, hoses and valves inspected and rated for the system pressure
  • Cylinders secured upright and transported with valves protected
  • Eye protection worn when connecting or venting

What to get right on this document

The scheme is the method

Temperatures and durations from the client’s plan.

Aerosol is the harm

How you run showers.

Records are the proof

Filled in at the outlet.

What this document has to cover

This looks like ‘running taps’ until someone scalds, floods a ward, or enters a confined tank. Write the actual outlets and temperatures.

A water hygiene flushing rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Legionella aerosol if outlets splash or showers are run carelessly
  • Scalding from hot flushes
  • Water damage / slips
  • Access to tanks and plant rooms
  • Chemicals if you dose
  • Patients or pupils using the facility

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • List outlets and the scheme’s duration/temperature
  • Exclude others from splash, run showers with reduced aerosol where specified
  • Record temperatures and times
  • Wipe and dry floors
  • Report dead-legs or failures to the dutyholder
  • Do not leave taps running unattended

Occupancy and other people

Healthcare and education buildings stay live. Do not flush a ward shower while a patient is in the cubicle.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Disinfectants if dosing
  • None if flush-only
  • PPE as the scheme

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer water hygiene flushing rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this COSHH?
Flushing water is not; dosing chemicals are.
Do I need confined space for tanks?
If you enter a tank, yes — a flush RAMS is not an entry RAMS.
Can caretakers use a generic sheet?
The sheet must still be site-specific to the outlet list.
What if an outlet fails temperature?
Report; do not hide it in a tick.