Method statement · UK
Underfloor tile holes method statement
A raised-floor method never names which tiles are open and who walks the floor after hours. Put this hold point first: prove-dead of the section and one-tile discipline before any tile is lifted — occupancy is part of the method, not a footnote.
Typical scope
- Prove-dead of the section and one-tile discipline before any tile is lifted as a hold point
- Which tiles are open and who walks the floor after hours written
- Exclusion that holds
- Restore in the dutyholder’s order
- Named abort
- Review before issue
Quick answer
A underfloor tile holes method statement is the sequence for working underfloor busway on a raised floor that still takes night cleaners on a named UK site. The hold point is prove-dead of the section and one-tile discipline before any tile is lifted. If someone new cannot brief which tiles are open and who walks the floor after hours from this method, it is not finished.
Primary topic: underfloor tile holes method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
raised-floor method reused
No prove-dead of the section and one-tile discipline before any tile is lifted.
Hold point buried
Which tiles are open and who walks the floor after hours is a step.
Occupancy ignored
The taped route and that an open tile is a hole.
Example
Underfloor tile holes sequence on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Working underfloor busway on a raised floor that still takes night cleaners. Hold point: prove-dead of the section and one-tile discipline before any tile is lifted. which tiles are open and who walks the floor after hours. the taped route and that an open tile is a hole.
Activities identified
- General site work
- Using chemicals or products
- Lone working
Method (5 steps)
- 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.
Main risks (2 in total)
Hazardous substances
Residual MediumWho: Operatives, people nearby
- Use the least hazardous product that does the job
- COSHH assessment in place for each hazardous substance and briefed to operatives
- Good ventilation during and after use
- Substances stored and disposed of as the Safety Data Sheet describes
- Gloves and eye protection as specified on the SDS
Lone working
Residual LowWho: Lone operatives
- Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
- Check-in procedure agreed with the office at set times
- Mobile phone charged and signal checked on arrival
What to get right on this document
Hold point first
Put this hold point first: prove-dead of the section and one-tile discipline before any tile is lifted.
Name the site facts
Which tiles are open and who walks the floor after hours
People who did not read it
Night cleaners will walk the floor
What this document has to cover
A raised-floor method never names which tiles are open and who walks the floor after hours. Put this hold point first: prove-dead of the section and one-tile discipline before any tile is lifted — occupancy is part of the method, not a footnote.
An underfloor tile holes method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Shock on a still-live section
- Open tiles as holes
- Night cleaners walking the floor
- Fire-stopping left open
- Restore with a tile out
- Unknown services in an old void
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Isolate and prove dead the named section
- Lift one tile at a time; cover holes when you step away
- Joint to the manufacturer’s method
- Fire-stop the same visit
- Tiles back before restore
- Hand over open tap-offs
Occupancy and other people
Night cleaners will walk the floor. Write the taped route and that an open tile is a hole as a method step.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances actually used on this sequence
- Cleaning agents of the protocol
- Residues you open
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer underfloor tile holes method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobUnderfloor busway RAMSCreate a underfloor busway rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesHow to write a method statementA practical sequence for writing a method statement that a principal contractor will actually read.
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this instead of the underfloor tile holes RAMS?
- No — it is the occupancy and sequence layer the job RAMS must include or attach.
- Can we skip prove-dead of the section and one-tile discipline before any tile is lifted?
- No. Prove-dead of the section and one-tile discipline before any tile is lifted is why this method exists.
- Who owns which tiles are open and who walks the floor after hours?
- The dutyholder named on the method. A poster is not a brief.
- Can AI issue this method?
- A tool can draft a underfloor tile holes method. A competent person reviews it for this site.