Skip to content
SafeForJob

Method statement · UK

Live utility diversion method statement

A trial-hole method never names which service is live and the remaining public route. Put this hold point first: the utility owner’s isolation before any joint is cut — occupancy is part of the method, not a footnote.

Typical scope

  • The utility owner’s isolation before any joint is cut as a hold point
  • Which service is live and the remaining public route written
  • Exclusion that holds
  • Restore in the dutyholder’s order
  • Named abort
  • Review before issue

Quick answer

A live utility diversion method statement is the sequence for diverting a live utility on a named site on a named UK site. The hold point is the utility owner’s isolation before any joint is cut. If someone new cannot brief which service is live and the remaining public route from this method, it is not finished.

Primary topic: live utility diversion method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • trial-hole method reused

    Missing: the utility owner’s isolation before any joint is cut.

  • Hold point buried

    Which service is live and the remaining public route is a step.

  • Occupancy ignored

    The remaining lane and that a dog walker will enter the headwall.

Example

Live utility diversion sequence on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Diverting a live utility on a named site. Hold point: the utility owner’s isolation before any joint is cut. which service is live and the remaining public route. the remaining lane and that a dog walker will enter the headwall.

Activities identified

  • General site work
  • Power tools
  • Occupied premises or public areas

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.

Main risks (3 in total)

Hand and power tools

Residual Low

Who: Operatives

  • Battery or 110V tools used; no 230V tools on site without RCD protection
  • Tools inspected before use and PAT tested where applicable
  • Guards fitted and used as designed
  • Eye protection and gloves suitable for the task

Noise and hand-arm vibration

Residual Medium

Who: Operatives, people nearby

  • Low-vibration, low-noise tools selected
  • Trigger times limited and rotated between operatives
  • Noisy work scheduled to reduce disruption to occupants
  • Hearing protection worn where noise is high

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

What to get right on this document

Hold point first

Put this hold point first: the utility owner’s isolation before any joint is cut.

Name the site facts

Which service is live and the remaining public route

People who did not read it

Streets stay open around you

What this document has to cover

A trial-hole method never names which service is live and the remaining public route. Put this hold point first: the utility owner’s isolation before any joint is cut — occupancy is part of the method, not a footnote.

A live utility diversion method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Strike on a live main
  • Collapse of the excavation
  • Public at an open crossing
  • Sewage or gas in the trench
  • Plant on a live carriageway
  • Restore without the owner’s test

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Utility owner agrees isolation and the permit
  • Locate; support the excavation
  • Cut only the isolated service
  • Make the diversion to the owner’s method
  • Owner tests
  • Restore the public route

Occupancy and other people

Streets stay open around you. Write the remaining lane and that a dog walker will enter the headwall as a method step.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances actually used on this sequence
  • Cleaning agents of the protocol
  • Residues you open

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer live utility diversion method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Is this instead of the live utility diversion RAMS?
No — it is the occupancy and sequence layer the job RAMS must include or attach.
Can we skip the utility owner’s isolation before any joint is cut?
No. The utility owner’s isolation before any joint is cut is why this method exists.
Who owns which service is live and the remaining public route?
The dutyholder named on the method. A poster is not a brief.
Can AI issue this method?
A tool can draft a live utility diversion method. A competent person reviews it for this site.