RAMS by job · UK
Service diversion RAMS
This is not a vacuum excavation RAMS. This job covers diverting a live utility on a named site, and the control that keeps people safe is the utility owner’s method and isolation before any joint is cut. If the RAMS never names which service is live, the public and the permit, a principal contractor will send it back.
Typical scope
- The utility owner’s method and isolation before any joint is cut as a hold point
- Which service is live, the public and the permit named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A service diversion rams covers diverting a live utility on a named site on a named UK site. The critical control is the utility owner’s method and isolation before any joint is cut. Write which service is live, the public and the permit into the sequence — a pack that could describe any vacuum excavation RAMS will not survive a competent review.
Primary topic: service diversion rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
vacuum excavation RAMS reused
Missing: the utility owner’s method and isolation before any joint is cut.
Critical control buried
Which service is live, the public and the permit belongs in the sequence.
Occupancy ignored
Which service is live, the public and the permit and that someone who did not read the pack will walk the exclusion.
Example
Service diversion on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Diverting a live utility on a named site at Riser 3, Warwick Quay, Warwick. Saturday 07:00–17:00. The utility owner’s method and isolation before any joint is cut; which service is live, the public and the permit; which service is live, the public and the permit and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Power tools
- Occupied premises or public areas
Method (6 steps)
- 1.Arrive and sign in. Arrive at Riser 3, Warwick Quay, Warwick, report to the Warwick Quay FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Warwick Quay FM site contact, report anything outstanding and sign out.
Main risks (3 in total)
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Critical control first
Put this hold point first: the utility owner’s method and isolation before any joint is cut.
Name the site facts
Which service is live, the public and the permit
People who did not read the pack
The named site stays in use around this service diversion job
What this document has to cover
This is not a vacuum excavation RAMS. This job covers diverting a live utility on a named site, and the control that keeps people safe is the utility owner’s method and isolation before any joint is cut. If the RAMS never names which service is live, the public and the permit, a principal contractor will send it back.
A service diversion rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if the utility owner’s method and isolation before any joint is cut is skipped on this service diversion job
- Service diversion left open so a passer-by reaches the hazard
- Wrong isolation so a sister service diversion stays live
- Manual handling or dropped parts on this service diversion job
- Weather, dust or a substance unique to diverting a live utility on a named site
- The next crew inheriting an open service diversion hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: the utility owner’s method and isolation before any joint is cut
- Brief the dutyholder on which service is live, the public and the permit
- Set an exclusion that matches vacuum excavation RAMS failing on this site
- Do the work to the sequence that keeps the utility owner’s method and isolation before any joint is cut first
- Test or prove the critical control still holds
- Handover residual service diversion hazards in writing
Occupancy and other people
The named site stays in use around this service diversion job. Write which service is live, the public and the permit and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while diverting a live utility on a named site
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer service diversion rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a vacuum excavation RAMS?
- No. A service diversion RAMS has to name which service is live, the public and the permit. A vacuum excavation RAMS will not survive a competent review.
- Can we skip the utility owner’s method and isolation before any joint is cut?
- No. The utility owner’s method and isolation before any joint is cut is the hold point. Write it before the work step.
- Who writes which service is live, the public and the permit?
- The competent person who issues this service diversion rams. A sticky note is not a handover.
- Can AI issue this service diversion rams?
- A tool can draft a service diversion pack. A competent person reviews and issues it for this site.