Method statement · UK
Ice-pad close method statement
A cold-room method never names which refrigerant and how public skating is stopped. Put this hold point first: refrigerant isolation and a closed-session plan before any valve is opened — occupancy is part of the method, not a footnote.
Typical scope
- Refrigerant isolation and a closed-session plan before any valve is opened as a hold point
- Which refrigerant and how public skating is stopped written
- Exclusion that holds
- Restore in the dutyholder’s order
- Named abort
- Review before issue
Quick answer
A ice-pad close method statement is the sequence for ice-rink plant work while the pad still wants to take clubs on a named UK site. The hold point is refrigerant isolation and a closed-session plan before any valve is opened. If someone new cannot brief which refrigerant and how public skating is stopped from this method, it is not finished.
Primary topic: ice-pad close method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
cold-room method reused
No refrigerant isolation and a closed-session plan before any valve is opened.
Hold point buried
Which refrigerant and how public skating is stopped is a step.
Occupancy ignored
The closed session and that a parent will walk the boards.
Example
Ice-pad close sequence on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Ice-rink plant work while the pad still wants to take clubs. Hold point: refrigerant isolation and a closed-session plan before any valve is opened. which refrigerant and how public skating is stopped. the closed session and that a parent will walk the boards.
Activities identified
- General site work
- Refrigerant handling
- Occupied premises or public areas
- Plumbing and heating systems
Method (12 steps)
- 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Isolate and drain down. Isolate the water/heating supply, allow to cool and drain down the affected section. Confirm isolation before breaking into pipework.
- 5.Recover refrigerant. Recover the refrigerant into a correctly rated, labelled recovery cylinder. Record quantities in line with F-gas requirements.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Install pipework. Install and connect pipework. Use press-fit or mechanical joints in place of hot works where possible.
- 8.Pressure test and evacuate. Pressure test with oxygen-free nitrogen, then evacuate the system before charging.
- 9.Charge the system. Charge the system with refrigerant to the manufacturer's specification and leak test all joints.
- 10.Test and commission. Test and commission the installation. Record results.
- 11.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 12.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.
Main risks (4 in total)
Refrigerant release
Residual LowWho: Engineers, building occupants
- Refrigerant handled only by F-gas certified engineers
- Refrigerant recovered into correctly rated, labelled recovery cylinders — never vented
- Good ventilation; no recovery work in enclosed spaces without assessment
- No ignition sources near flammable (A2L/A3) refrigerants; leak detector in use
- Cryogenic-rated gloves and eye protection when connecting hoses
Stored pressure
Residual LowWho: Engineers
- Systems depressurised and drained down before breaking into pipework
- Gauges, hoses and valves inspected and rated for the system pressure
- Cylinders secured upright and transported with valves protected
- Eye protection worn when connecting or venting
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
Hot water, hot surfaces and flooding
Residual LowWho: Operatives, occupants
- System isolated, allowed to cool and drained down before work
- Isolation valves identified and tested before breaking into pipework
- Drip trays, buckets and wet vac available
- Gloves when handling recently isolated pipework
What to get right on this document
Hold point first
Put this hold point first: refrigerant isolation and a closed-session plan before any valve is opened.
Name the site facts
Which refrigerant and how public skating is stopped
People who did not read it
Clubs book the ice
What this document has to cover
A cold-room method never names which refrigerant and how public skating is stopped. Put this hold point first: refrigerant isolation and a closed-session plan before any valve is opened — occupancy is part of the method, not a footnote.
An ice-pad close method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Refrigerant over a public pad
- Public still on the ice under a lift
- Cold burns in the plant trench
- Unexpected compressor start
- Ammonia or CO2 treated as ‘just gas’
- Parent walking the boards
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Operations close the pad
- Isolate refrigerant to the procedure
- Lock compressors; treat residual liquid as live until drained
- Do the work
- Leak-check before the pad is offered back
- Operations accept temperature
Occupancy and other people
Clubs book the ice. Write the closed session and that a parent will walk the boards as a method step.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances actually used on this sequence
- Cleaning agents of the protocol
- Residues you open
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer ice-pad close method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobIce-rink plant RAMSCreate a ice-rink plant rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesHow to write a method statementA practical sequence for writing a method statement that a principal contractor will actually read.
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this instead of the ice-pad close RAMS?
- No — it is the occupancy and sequence layer the job RAMS must include or attach.
- Can we skip refrigerant isolation and a closed-session plan before any valve is opened?
- No. Refrigerant isolation and a closed-session plan before any valve is opened is why this method exists.
- Who owns which refrigerant and how public skating is stopped?
- The dutyholder named on the method. A poster is not a brief.
- Can AI issue this method?
- A tool can draft a ice-pad close method. A competent person reviews it for this site.