Ice-rink plant RAMS

This is not a cold-room RAMS. This job covers working on refrigeration plant that holds an ice pad, and the control that keeps people safe is refrigerant isolation and a written pad-temperature limit before any valve is opened. If the RAMS never names which refrigerant, the pad owner and how public skating is stopped, a principal contractor will send it back.

Typical scope

  • Refrigerant isolation and a written pad-temperature limit before any valve is opened as a hold point
  • Which refrigerant, the pad owner and how public skating is stopped named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A ice-rink plant rams covers working on refrigeration plant that holds an ice pad on a named UK site. The critical control is refrigerant isolation and a written pad-temperature limit before any valve is opened. Write which refrigerant, the pad owner and how public skating is stopped into the sequence — a pack that could describe any cold-room RAMS will not survive a competent review.

Primary topic: ice-rink plant rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • cold-room RAMS reused

    No refrigerant isolation and a written pad-temperature limit before any valve is opened.

  • Critical control buried

    Which refrigerant, the pad owner and how public skating is stopped belongs in the sequence.

  • Occupancy ignored

    The closed session and that a parent will walk the boards.

Example

Ice-rink plant on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Working on refrigeration plant that holds an ice pad at Plant trench, Riverside Ice, Perth. Monday pad closed 00:00–10:00. Refrigerant isolation and a written pad-temperature limit before any valve is opened; which refrigerant, the pad owner and how public skating is stopped; the closed session and that a parent will walk the boards.

Activities identified

  • General site work
  • Refrigerant handling
  • Excavation
  • Occupied premises or public areas
  • Plumbing and heating systems

Method (15 steps)

  1. 1.Arrive and sign in. Arrive at Plant trench, Riverside Ice, Perth, report to the Riverside Ice Trust site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
  5. 5.Isolate and drain down. Isolate the water/heating supply, allow to cool and drain down the affected section. Confirm isolation before breaking into pipework.
  6. 6.Recover refrigerant. Recover the refrigerant into a correctly rated, labelled recovery cylinder. Record quantities in line with F-gas requirements.
  7. 7.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
  8. 8.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  9. 9.Install pipework. Install and connect pipework. Use press-fit or mechanical joints in place of hot works where possible.
  10. 10.Pressure test and evacuate. Pressure test with oxygen-free nitrogen, then evacuate the system before charging.
  11. 11.Charge the system. Charge the system with refrigerant to the manufacturer's specification and leak test all joints.
  12. 12.Test and commission. Test and commission the installation. Record results.
  13. 13.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
  14. 14.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  15. 15.Hand over and sign out. Hand over to the Riverside Ice Trust site contact, report anything outstanding and sign out.

Main risks (6 in total)

Refrigerant release

Residual Low

Who: Engineers, building occupants

  • Refrigerant handled only by F-gas certified engineers
  • Refrigerant recovered into correctly rated, labelled recovery cylinders — never vented
  • Good ventilation; no recovery work in enclosed spaces without assessment
  • No ignition sources near flammable (A2L/A3) refrigerants; leak detector in use
  • Cryogenic-rated gloves and eye protection when connecting hoses

Stored pressure

Residual Low

Who: Engineers

  • Systems depressurised and drained down before breaking into pipework
  • Gauges, hoses and valves inspected and rated for the system pressure
  • Cylinders secured upright and transported with valves protected
  • Eye protection worn when connecting or venting

Excavation collapse and falls into excavations

Residual Medium

Who: Operatives, public

  • Excavations battered back or supported (trench boxes/shoring) where people enter
  • Spoil and plant kept away from the edge
  • Edge protection and barriers around open excavations
  • Excavations inspected at the start of each shift by a competent person

Striking buried services

Residual Medium

Who: Operatives, public

  • Service drawings obtained before digging
  • Area scanned with a CAT and Genny by a trained operator; services marked
  • Trial holes dug by hand near located services (safe digging practice)

+ 2 more risks in the full RAMS.

What to get right on this document

Critical control first

Put this hold point first: refrigerant isolation and a written pad-temperature limit before any valve is opened.

Name the site facts

Which refrigerant, the pad owner and how public skating is stopped

People who did not read the pack

Clubs book the ice

What this document has to cover

This is not a cold-room RAMS. This job covers working on refrigeration plant that holds an ice pad, and the control that keeps people safe is refrigerant isolation and a written pad-temperature limit before any valve is opened. If the RAMS never names which refrigerant, the pad owner and how public skating is stopped, a principal contractor will send it back.

An ice-rink plant rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Refrigerant release over a public pad
  • Cold burns and hypothermia in the plant trench
  • Unexpected start of a compressor
  • Public still on the ice under a lift
  • Ammonia or CO2 treated as ‘just gas’
  • Oil-soaked walkways

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Operations close the pad; isolate refrigerant to the procedure
  • Lock compressors; treat residual liquid as live until drained
  • Do the valve or compressor work with the named method
  • Leak-check before the pad is offered back
  • Operations accept temperature
  • Handover residual charge and alarms

Occupancy and other people

Clubs book the ice. Write the closed session and that a parent will walk the boards as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Named refrigerant
  • Compressor oil
  • Glycol if secondary

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer ice-rink plant rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a cold-room RAMS?
No. A ice-rink plant RAMS has to name which refrigerant, the pad owner and how public skating is stopped. A cold-room RAMS will not survive a competent review.
Can we skip refrigerant isolation and a written pad-temperature limit before any valve is opened?
No. Refrigerant isolation and a written pad-temperature limit before any valve is opened is the hold point. Write it before the work step.
Who writes which refrigerant, the pad owner and how public skating is stopped?
The competent person who issues this ice-rink plant rams. A sticky note is not a handover.