HV switching method statement

An LV-switchgear method is the wrong voltage. If the sequence does not attach the switching schedule and name who may operate, it is not an HV method. This page is not a training course.

Typical scope

  • AP and schedule attached
  • Compound excluded
  • Prove dead as the schedule
  • Permit to the working party
  • Restore only as written
  • Life-safety during the outage

Quick answer

An HV-switching method statement is the sequence for planned switching on a named high-voltage network: authorised person, switching schedule, proving dead, and a building or process that must stay safe in the dark.

Primary topic: hv switching method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • LV board method reused

    Wrong voltage, no AP schedule.

  • Closed a switch because ‘the job looked finished’

    Not the schedule.

  • Compound gate left on the latch

    Unauthorised entry.

Example

Planned 11 kV outage for a transformer

Built from one job description. You review and adjust every item before issuing it.

Job description

Switch out TX2 at Elmswell Business Park, Ipswich, Sunday 05:00–14:00. AP with the attached schedule, compound excluded, life-safety lighting agreed, working party on permit, restore only as written.

Activities identified

  • General site work
  • Electrical isolation

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at HV compound, Elmswell Business Park, Ipswich, report to the Elmswell Park FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  5. 5.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Elmswell Park FM site contact, report anything outstanding and sign out.

Main risks (1 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

What to get right on this document

The schedule is the method

Attach it.

Only the AP switches

Named.

Restore is written

Not memory.

What this document has to cover

An LV-switchgear method is the wrong voltage. If the sequence does not attach the switching schedule and name who may operate, it is not an HV method. This page is not a training course.

A hv switching method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Electric shock and arc on HV that was not isolated to the schedule
  • Wrong circuit opened so a live network is the one you approached
  • Building-wide blackout affecting life-safety
  • Stored energy in cables and capacitors
  • Unauthorised person in the compound during switching
  • Incorrect labelling so the next person switches the wrong device

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Authorised person confirms the schedule, limits of work and alternative supplies
  • Exclude the compound; life-safety provisions the client has approved
  • Switch, lock, earth and prove dead only as the schedule
  • Issue the permit to the working party
  • On completion, restore only as the schedule; never ‘just close it’
  • Hand over records, remaining defects and updated labels

Occupancy and other people

Hospitals, data halls and care homes lose more than lights. Write who walks the building in the dark and that a cleaner is not allowed in the compound.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Cleaning solvents on compound equipment if used
  • Grease on mechanisms
  • SF6 only if that equipment is in the visit — specialist method

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer hv switching method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Is this LV switchgear replacement?
Different voltage and competence. Use this for HV switching.
Who is the authorised person?
Name them — the method should not assume a card in the van.
Can we run on the generator?
Only if the changeover is designed and isolated from the work. Write it.
Is this legal advice on the Electricity at Work Regulations?
No. Follow the network’s safety rules.