RAMS by job · UK
Substation LV board RAMS
A substation is not a plant cupboard. If the RAMS does not name who is authorised, where HV starts, and how you get a casualty out of the compound, it is not ready.
Typical scope
- Named authorised persons
- HV boundary written
- Switching schedule
- Second person
- Gate control
- Updated single-line
Quick answer
A substation LV-board RAMS covers working on the LV side of a private or landlord substation: isolation, panels and the interface with HV that you do not touch. Authorisation, arc-flash and confined plant space dominate.
Primary topic: substation lv board rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Plant-room board RAMS reused
No HV boundary, no switching schedule.
Gate wedged for the van
Public in a substation.
Working alone on the LV
No second person.
Example
Private substation LV panel works
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace an LV ACB at the private substation serving Mersey Works, Birkenhead. AP switching schedule, HV room locked and signed out of this package, second person, compound gate attended, site outage Sunday 06:00–12:00, single-line updated.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Private substation, Mersey Works, Birkenhead, report to the Mersey Works Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Mersey Works Ltd site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Authorisation is the first line
Names, not ‘the electrician’.
HV is a wall
Do not cross it on this RAMS.
The gate is a control
Locked or attended.
What this document has to cover
A substation is not a plant cupboard. If the RAMS does not name who is authorised, where HV starts, and how you get a casualty out of the compound, it is not ready.
A substation lv board rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock or arc flash on LV switchgear
- Inadvertent approach to HV that is outside this package
- Confined compound — heat, restricted escape
- Dropped tools across exposed busbars
- Unauthorised persons at an open compound gate
- Wrong isolation so a transformer back-feeds the board
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm authorisation, switching schedule and that HV is behind a locked boundary you will not cross
- Isolate LV to the schedule; prove dead; erect screens
- Do the board work with insulated tools and a second person
- Keep the compound gate controlled; no propped access
- Test, label, restore only to the schedule
- Hand over residual hazards and updated single-line
Occupancy and other people
Schools and industrial estates sit outside the compound. Write who holds the keys, who is told if the site loses power, and that pupils cannot treat the compound as a shortcut.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Cleaning solvents
- Grease on mechanisms
- Arc-flash PPE as specified by the assessment — not a fashion choice
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer substation lv board rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Can I operate the HV?
- Not on this RAMS. HV is a different authorisation.
- Is this legal advice on EAWR?
- No. It is a site method you still have to review.
- Do I need arc-flash PPE?
- Follow the client’s assessment or get one — do not invent a calorie rating here.
- Who keeps the keys?
- The dutyholder named on the schedule.