Method statement · UK

DALI occupied floor method statement

A lighting-rewire method never names which floors go dark and temporary lighting. Put this hold point first: isolation of the lighting circuit before any bus is opened — occupancy is part of the method, not a footnote.

Typical scope

  • Isolation of the lighting circuit before any bus is opened as a hold point
  • Which floors go dark and temporary lighting written
  • Exclusion that holds
  • Restore in the dutyholder’s order
  • Named abort
  • Review before issue

Quick answer

A dali occupied floor method statement is the sequence for addressing DALI on a floor that stays at desks on a named UK site. The hold point is isolation of the lighting circuit before any bus is opened. If someone new cannot brief which floors go dark and temporary lighting from this method, it is not finished.

Primary topic: dali occupied floor method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • lighting-rewire method reused

    No isolation of the lighting circuit before any bus is opened.

  • Hold point buried

    Which floors go dark and temporary lighting is a step.

  • Occupancy ignored

    Which floors go dark and that cleaners will walk a taped corridor after 18:00.

Example

DALI occupied floor sequence on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Addressing DALI on a floor that stays at desks. Hold point: isolation of the lighting circuit before any bus is opened. which floors go dark and temporary lighting. which floors go dark and that cleaners will walk a taped corridor after 18:00.

Activities identified

  • General site work
  • Electrical isolation
  • Using chemicals or products

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Named UK site on the pack, report to the Dutyholder on the pack site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  5. 5.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
  6. 6.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Dutyholder on the pack site contact, report anything outstanding and sign out.

Main risks (2 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Hazardous substances

Residual Medium

Who: Operatives, people nearby

  • Use the least hazardous product that does the job
  • COSHH assessment in place for each hazardous substance and briefed to operatives
  • Good ventilation during and after use
  • Substances stored and disposed of as the Safety Data Sheet describes
  • Gloves and eye protection as specified on the SDS

What to get right on this document

Hold point first

Put this hold point first: isolation of the lighting circuit before any bus is opened.

Name the site facts

Which floors go dark and temporary lighting

People who did not read it

Offices stay at desks

What this document has to cover

A lighting-rewire method never names which floors go dark and temporary lighting. Put this hold point first: isolation of the lighting circuit before any bus is opened — occupancy is part of the method, not a footnote.

A dali occupied floor method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Shock on an unproven circuit
  • Shorted bus dropping a live floor
  • Falls from a podium in a live void
  • Dropped fittings onto desks
  • Festoon left as permanent
  • Cleaners walking a taped corridor

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • AP isolates and proves dead the named circuit
  • Set exclusion under open ceilings
  • Address devices to the design
  • Temporary lighting only as written
  • Test scenes
  • Hand over the address schedule

Occupancy and other people

Offices stay at desks. Write which floors go dark and that cleaners will walk a taped corridor after 18:00 as a method step.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances actually used on this sequence
  • Cleaning agents of the protocol
  • Residues you open

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer dali occupied floor method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Is this instead of the dali occupied floor RAMS?
No — it is the occupancy and sequence layer the job RAMS must include or attach.
Can we skip isolation of the lighting circuit before any bus is opened?
No. Isolation of the lighting circuit before any bus is opened is why this method exists.
Who owns which floors go dark and temporary lighting?
The dutyholder named on the method. A poster is not a brief.
Can AI issue this method?
A tool can draft a dali occupied floor method. A competent person reviews it for this site.