RAMS by job · UK
DALI lighting control RAMS
This is not a lighting rewire RAMS. This job covers addressing and commissioning DALI fittings and a gateway on a named lighting circuit, and the control that keeps people safe is isolation and prove-dead of that circuit before any bus is opened. If the RAMS never names the DALI bus, the gateway and which floors stay on temporary lighting, a principal contractor will send it back.
Typical scope
- Named circuit isolated and proved dead
- DALI address schedule
- Temporary lighting written
- Exclusion under the grid
- Scene test before reopen
- Handover of uncommissioned points
Quick answer
A dali lighting rams covers addressing and commissioning DALI fittings and a gateway on a named lighting circuit on a named UK site. The critical control is isolation and prove-dead of that circuit before any bus is opened. Write the DALI bus, the gateway and which floors stay on temporary lighting into the sequence — a pack that could describe any lighting rewire RAMS will not survive a competent review.
Primary topic: dali lighting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Lighting rewire RAMS reused
No bus, no gateway, no addressing.
Live bus ‘to keep the floor lit’
Unauthorised work on a live circuit.
Address list on a phone note
Nobody can restore a scene.
Example
Gateway cutover on a live office
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace the DALI gateway on floors 3–4 at Quay Court, Dundee. Saturday isolation 07:00–15:00, temporary task lighting, address schedule attached, cleaners briefed, floor 3 dark only for that window.
Activities identified
- General site work
- Electrical isolation
- Manual handling
- Using chemicals or products
Method (10 steps)
- 1.Arrive and sign in. Arrive at Floors 3–4, Quay Court, Dundee, report to the Quay Court FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 6.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
- 7.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
- 8.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
- 9.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 10.Hand over and sign out. Hand over to the Quay Court FM site contact, report anything outstanding and sign out.
Main risks (3 in total)
Electric shock or burns
Residual MediumWho: Operatives, building occupants
- Work carried out dead — no live working
- Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
- Only competent, qualified electricians carry out electrical work
- Permit to work obtained where the site requires one
- Personal locks and keys retained by the person working
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Hazardous substances
Residual MediumWho: Operatives, people nearby
- Use the least hazardous product that does the job
- COSHH assessment in place for each hazardous substance and briefed to operatives
- Good ventilation during and after use
- Substances stored and disposed of as the Safety Data Sheet describes
- Gloves and eye protection as specified on the SDS
What to get right on this document
The circuit is dead until proved
Lock, test, then open the bus.
Addresses are a method
Design schedule, not guesswork.
Temporary lighting is planned
Not leftover festoon.
What this document has to cover
This is not a lighting rewire RAMS. This job covers addressing and commissioning DALI fittings and a gateway on a named lighting circuit, and the control that keeps people safe is isolation and prove-dead of that circuit before any bus is opened. If the RAMS never names the DALI bus, the gateway and which floors stay on temporary lighting, a principal contractor will send it back.
A dali lighting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock on an unproven lighting circuit
- A shorted bus dropping a live floor to darkness
- Falls from a podium in an occupied office void
- Dropped fittings striking people at desks
- Temporary festoon left as the permanent install
- Other trades walking an open grid as a shortcut
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Authorised person isolates, locks and proves dead the named lighting circuit
- Set exclusion under open ceilings and keep an escape
- Land and address devices to the design — no ad-hoc grouping
- Terminate the gateway, label the bus and restore temporary lighting only as written
- Test scenes and emergency fittings before anyone asks to reopen
- Hand over the address schedule and remaining uncommissioned points
Occupancy and other people
Offices stay at desks. Write which floors go dark, for how long, and that cleaners will walk a taped corridor after 18:00.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- IPA wipes on gear trays
- Dust from ceiling tiles
- Cable-pulling lubricant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer dali lighting rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a lighting rewire?
- No. This RAMS is control addressing and a live bus, not a new circuit.
- Can I work live to keep lights on?
- Default is isolate. Temporary task lighting is the control — do not improvise live work.
- Who owns the address schedule?
- The installer named on the RAMS. A sticky note is not a handover.
- Can AI issue this RAMS?
- A tool can draft. A competent person reviews it for this floor and this gateway.