Basement waterproofing method statement
A decorating method in a cellar misses oxygen, solvent vapour, sump electrical isolation and the family still using the stair. Tanking is a system in a hole.
Typical scope
- Specified system
- Ventilation and escape kept
- Sump logic in a storm
- Abort on running water if the spec says so
- Stair not a store
- Sump commissioned
Quick answer
A basement-waterproofing method statement is the sequence for applying a specified tanking or cavity-drain system in a named basement: confined working, solvent or cement COSHH, and not trapping people if a hatch is the only way out.
Primary topic: basement waterproofing method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Paint method reused
No vapour, no escape.
Sump isolated before a storm weekend
Flood.
Membrane against running water
Failed system.
Example
Cavity-drain tanking in an occupied house
Built from one job description. You review and adjust every item before issuing it.
Job description
Install specified cavity drain in the cellar at 19 Alma Terrace, Sheffield. Family using the ground floor, stair kept, ventilation, sump remains on a temporary pump during works, no solvent primer in a closed cellar, occupier maintenance brief.
Activities identified
- General site work
- Manual handling
- Using chemicals or products
Method (7 steps)
- 1.Arrive and sign in. Arrive at 19 Alma Terrace, Sheffield, report to the Private homeowner site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Private homeowner site contact, report anything outstanding and sign out.
Main risks (2 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Hazardous substances
Residual MediumWho: Operatives, people nearby
- Use the least hazardous product that does the job
- COSHH assessment in place for each hazardous substance and briefed to operatives
- Good ventilation during and after use
- Substances stored and disposed of as the Safety Data Sheet describes
- Gloves and eye protection as specified on the SDS
What to get right on this document
The system is specified
Slurry vs cavity drain.
The hatch is an escape
Keep it.
Sump is occupancy
Storm logic.
What this document has to cover
A decorating method in a cellar misses oxygen, solvent vapour, sump electrical isolation and the family still using the stair. Tanking is a system in a hole.
A basement waterproofing method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Solvent vapour or cement burns in a poorly ventilated basement
- Oxygen deficiency or fumes from plant at the hatch
- Escape blocked by materials at the only stair
- Slips on wet slurry
- Electrical isolation of a sump that must stay pumping in a storm
- Failed system if you coat over running water against the specification
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the specified system and a second means of getting a casualty out if the hatch is tight
- Ventilate; gas monitor if the risk assessment requires it; keep the stair clear
- Isolate services as needed; do not kill a sump in a rain warning without a plan
- Prep and apply to the specification; abort if water is running against the system
- Cure exclusion; no family storage in the bay
- Commission drainage channels and sump; handover maintenance
Occupancy and other people
Homes stay lived in above. Write how the family reach the garden and that a blocked cellar stair is occupancy, not storage.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Tanking slurry or membranes (name the actual)
- Primers / solvents if used
- Cementitious repair mortars
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer basement waterproofing method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by jobBasement tanking RAMSCreate a basement tanking rams for a named UK site. Unique hazards, method sequence and occupancy notes you review before issue.
- GuidesHow to write a method statementA practical sequence for writing a method statement that a principal contractor will actually read.
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
Questions
- Is this the same as a damp-proof cream?
- No — this is a specified basement system.
- Solvent primer?
- Ventilate or change product — write COSHH from the SDS, not the SDS alone.
- Who designs the sump?
- The waterproofing design — do not invent a pump.
- Party wall cellar?
- Do not tank the neighbour’s wall without the agreements.