Basement waterproofing method statement

A decorating method in a cellar misses oxygen, solvent vapour, sump electrical isolation and the family still using the stair. Tanking is a system in a hole.

Typical scope

  • Specified system
  • Ventilation and escape kept
  • Sump logic in a storm
  • Abort on running water if the spec says so
  • Stair not a store
  • Sump commissioned

Quick answer

A basement-waterproofing method statement is the sequence for applying a specified tanking or cavity-drain system in a named basement: confined working, solvent or cement COSHH, and not trapping people if a hatch is the only way out.

Primary topic: basement waterproofing method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Paint method reused

    No vapour, no escape.

  • Sump isolated before a storm weekend

    Flood.

  • Membrane against running water

    Failed system.

Example

Cavity-drain tanking in an occupied house

Built from one job description. You review and adjust every item before issuing it.

Job description

Install specified cavity drain in the cellar at 19 Alma Terrace, Sheffield. Family using the ground floor, stair kept, ventilation, sump remains on a temporary pump during works, no solvent primer in a closed cellar, occupier maintenance brief.

Activities identified

  • General site work
  • Manual handling
  • Using chemicals or products

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at 19 Alma Terrace, Sheffield, report to the Private homeowner site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Private homeowner site contact, report anything outstanding and sign out.

Main risks (2 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Hazardous substances

Residual Medium

Who: Operatives, people nearby

  • Use the least hazardous product that does the job
  • COSHH assessment in place for each hazardous substance and briefed to operatives
  • Good ventilation during and after use
  • Substances stored and disposed of as the Safety Data Sheet describes
  • Gloves and eye protection as specified on the SDS

What to get right on this document

The system is specified

Slurry vs cavity drain.

The hatch is an escape

Keep it.

Sump is occupancy

Storm logic.

What this document has to cover

A decorating method in a cellar misses oxygen, solvent vapour, sump electrical isolation and the family still using the stair. Tanking is a system in a hole.

A basement waterproofing method statement only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Solvent vapour or cement burns in a poorly ventilated basement
  • Oxygen deficiency or fumes from plant at the hatch
  • Escape blocked by materials at the only stair
  • Slips on wet slurry
  • Electrical isolation of a sump that must stay pumping in a storm
  • Failed system if you coat over running water against the specification

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm the specified system and a second means of getting a casualty out if the hatch is tight
  • Ventilate; gas monitor if the risk assessment requires it; keep the stair clear
  • Isolate services as needed; do not kill a sump in a rain warning without a plan
  • Prep and apply to the specification; abort if water is running against the system
  • Cure exclusion; no family storage in the bay
  • Commission drainage channels and sump; handover maintenance

Occupancy and other people

Homes stay lived in above. Write how the family reach the garden and that a blocked cellar stair is occupancy, not storage.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Tanking slurry or membranes (name the actual)
  • Primers / solvents if used
  • Cementitious repair mortars

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer basement waterproofing method statement document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All method statements · RAMS by trade · Free RAMS generator

Questions

Is this the same as a damp-proof cream?
No — this is a specified basement system.
Solvent primer?
Ventilate or change product — write COSHH from the SDS, not the SDS alone.
Who designs the sump?
The waterproofing design — do not invent a pump.
Party wall cellar?
Do not tank the neighbour’s wall without the agreements.