Basement tanking RAMS

Tanking is a designed waterproofing system, not a coat of bitumen. A decorating RAMS that never mentions the cavity drain, sump interface or how you keep an escape from a cellar will fail the warranty inspector.

Typical scope

  • Specified system
  • Ventilation and escape from the basement
  • Corners and penetrations detailed
  • Sump / drain interface
  • No tanking over running water unless designed
  • Cure no-store period

Quick answer

A basement-tanking RAMS covers preparing walls and applying a specified waterproofing system in a named basement. Confined access, chemical COSHH, and not trapping people in a half-coated cellar are the critical controls.

Primary topic: basement tanking rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Paint RAMS reused

    No drain, no confined access.

  • Bitumen on a wet running wall

    System fail.

  • Stair sheeted with no other way out

    Trapped.

Example

Cavity-drain tanking under a shop

Built from one job description. You review and adjust every item before issuing it.

Job description

Tank the basement at 8 Pride Hill, Shrewsbury. Specified cavity-drain, sump as drawn, forced ventilation, shop using the rear stair only, corners detailed Saturday, no stock on the membrane until the warranty hold point.

Activities identified

  • General site work
  • Confined space
  • Occupied premises or public areas

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Basement, 8 Pride Hill, Shrewsbury, report to the Pride Hill Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Confined space permit and gas test. Obtain the permit to work, test the atmosphere and confirm rescue arrangements before anyone enters.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Pride Hill Estates site contact, report anything outstanding and sign out.

Main risks (2 in total)

Confined space

Residual Medium

Who: Operatives, rescuers

  • Avoid entry — do the work from outside where possible
  • Permit to work and confined space trained operatives
  • Atmosphere tested before and during entry with a calibrated gas monitor
  • Emergency rescue arrangements in place before entry

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

What to get right on this document

The system is designed

Primer, corners, drain.

A cellar is confined-adjacent

Air and a way out.

Cure is occupancy

Do not store on it.

What this document has to cover

Tanking is a designed waterproofing system, not a coat of bitumen. A decorating RAMS that never mentions the cavity drain, sump interface or how you keep an escape from a cellar will fail the warranty inspector.

A basement tanking rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Confined access — fumes and restricted escape in a cellar
  • Chemical burns from primers and membranes
  • Water and slips on a working basement floor
  • Collapse or undermining if you chase a wall blindly
  • Occupants using the only cellar stair you have sheeted off
  • Failed system if you skip the specified primer or corners

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm the specified system, drainage and a second means of getting out of the basement
  • Ventilate; set COSHH for the actual primer and membrane
  • Prep to the specification; do not tank over running water unless the system allows it
  • Apply, detail corners and penetrations the same visit you open them
  • Interface the sump or cavity drain as designed
  • Cure exclusion; do not store the family’s bikes on a wet membrane

Occupancy and other people

Houses and shops stay in use above. Write how people reach stored goods and that a sheeted stair is not an escape.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Primers and bitumen or cementitious tanking (name the actual)
  • Solvents if used
  • Cement dust from prep

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer basement tanking rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this a paint job?
No — a specified waterproofing system and drainage.
Do I need confined-space?
Assess the cellar; add a plan if ventilation and escape are poor.
Type A vs Type C?
Write the actual system — they are not interchangeable.
Who owns the warranty?
Follow the manufacturer hold points — do not skip them.