Issued vs draft RAMS — freeze a version before the brief

Principal contractors ask who signed it and which file is live. If draft and issued live as the same Word name, you cannot answer. The product distinction is review then freeze, not a red watermark you ignore.

On this page

  • Draft for edit
  • Issue to freeze
  • Brief the frozen file
  • New draft if the job changes
  • COSHH in step
  • Retrievable version

Quick answer

Issued versus draft is the difference between a file you are still changing and a version a crew can work to. Briefing a moving draft is how isolation points change after people have signed.

Primary topic: issued vs draft rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Silent edits after signatures

    Nobody knows what was briefed.

  • Draft emailed ‘for use Monday’

    Not issued.

  • COSHH still ‘TBC’ on an issued RAMS

    Pack incomplete.

What to get right on this document

Freeze then brief

Order is a control.

Job change means a new version

Not a sticky note.

Who signs sits on the issued pack

Named reviewer.

What this document has to cover

Principal contractors ask who signed it and which file is live. If draft and issued live as the same Word name, you cannot answer. The product distinction is review then freeze, not a red watermark you ignore.

An issued vs draft rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Crew briefed on a draft that changed after they signed
  • Two PDFs both called FINAL
  • COSHH still in draft while the RAMS is issued
  • Old issued version left in the site folder next to a new draft
  • No acknowledgement sheet because ‘everyone saw the email’
  • Edits on site never copied back into a new issued version

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Edit in draft until a competent person is content
  • Issue/freeze a version with a date and reviewer
  • Brief that version; collect acknowledgements against it
  • If the job changes, open a new draft from the issued pack — do not silent-edit the frozen file
  • Keep COSHH in step with the issued RAMS
  • Retrieve the issued file when someone asks what was briefed

Occupancy and other people

The people on site occupy the issued version, not your laptop draft. Night shifts will print whatever is on the plot printer.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances on the issued method must point at issued COSHH, not a draft SDS pile

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer issued vs draft rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Is issuing a legal ceremony?
This is not legal advice. You need a pack the crew can follow and you can retrieve.
Can a supervisor edit on site?
If they do, that is a new draft — issue again before the next shift works to it.
What about dynamic risk assessment?
It does not replace the issued RAMS; see the dynamic-vs-RAMS guide.
Who signs?
A competent reviewer — see who signs a RAMS.