Skip to content
SafeForJob

Guides · UK

Who signs a RAMS? Preparer, reviewer, team

Collecting signatures without a briefing is theatre.

On this page

  • Preparer
  • Reviewer
  • Team acknowledgement
  • Revision
  • Agency/night catch-up
  • Not a substitute for competence

Quick answer

Typically a RAMS is prepared by someone competent for the work, reviewed if your system requires it, and acknowledged by the people who will follow it. A director’s signature does not make a generic document site-specific.

Primary topic: who signs a rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Blank signature page

    Theatre.

  • Old revision signed

    Wrong method.

  • Director stamp as magic

    Still generic.

What to get right on this document

Name preparer

Competence.

Brief then sign

Order.

New revision, new acknowledgement

Change.

What this document has to cover

Collecting signatures without a briefing is theatre.

A who signs a rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Nobody named as preparer
  • Everyone signs a document they have not seen
  • Reviewer who has never visited the site and does not read it
  • Missing acknowledgements for agency staff

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Name the preparer
  • Review if required
  • Brief
  • Acknowledge
  • Re-sign if the revision changes

Occupancy and other people

Night shift and agency need a path to acknowledge the current revision.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • N/A

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer who signs a rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Is a review legally required?
Your system and client may require it; competence of the preparer still matters.
Can the same person prepare and review?
Better if someone else checks; small firms often cannot — be honest.
Digital signatures?
Fine if you can show who acknowledged which revision.
SafeForJob acknowledgements?
The product can record them; you still brief.