How often should you review a RAMS?
The failure is issuing once in January and still using it in November on a different floor.
On this page
- Change-driven
- Re-brief
- Revision numbers
- Incidents
- Occupancy changes
- Not only annual
Quick answer
Review a RAMS when something that could affect risk changes: access, occupancy, plant, substances, other trades, or an incident. A yearly review of an unused file is not a substitute for reviewing the live job.
Primary topic: how often review rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Same PDF all year
Wrong floor.
Incident, no update
Same hole.
New scaffold, old RAMS
Access changed.
What to get right on this document
Change is the clock
Not the calendar alone.
Re-brief
New revision.
Occupancy
Term vs holiday.
What this document has to cover
The failure is issuing once in January and still using it in November on a different floor.
A how often review rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Annual review theatre
- No review after a change
- Incident with no RAMS update
- New trade in the same zone ignored
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Issue for this job
- Watch for change
- Update and re-brief
- Record the revision
- Do not wait for the anniversary if the job moved
Occupancy and other people
A school in term vs holiday is a review trigger even if the task is the same.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- New substances trigger COSHH review too
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer how often review rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesSite-specific vs generic RAMSGeneric RAMS get rejected. What ‘site-specific’ actually means on a UK job.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS briefing / toolbox talkA RAMS that nobody heard is a file. How to brief it so the critical control is understood.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWorking at height in RAMSHow to describe access equipment, fragile surfaces and rescue thinking inside a RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesCDM and RAMS responsibilitiesHow contractors use RAMS under CDM without pretending software assigns legal duties. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS for occupied premisesExtra controls when residents, staff, patients or customers stay in the building. Practical UK guidance for contractors — with links to free tools.
Questions
- Is there a legal interval?
- Review must be suitable — change-based. Clients may also set intervals.
- What counts as a change?
- Anything that makes the written method untrue.
- Minor snagging?
- If access or occupancy changed, review.
- Software reminders?
- Useful; they don’t replace judgement.