Skip to content
SafeForJob

Guides · UK

Site-specific vs generic RAMS

Clients notice. So do people who get hurt because the isolation point was on a different floor.

On this page

  • Names
  • Access
  • Occupancy
  • This task
  • This emergency plan
  • This revision

Quick answer

A site-specific RAMS names this client, this address, this access, this occupancy and this sequence. A generic RAMS describes a trade in the abstract and hopes nobody notices last month’s plot number.

Primary topic: site specific vs generic rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Find-and-replace site only

    Method still wrong.

  • One RAMS for a whole framework

    Tasks differ.

  • Never reviewed

    Plant changed.

What to get right on this document

Job description first

Not the old PDF.

Occupancy

Write it.

Revision when it changes

Re-brief.

What this document has to cover

Clients notice. So do people who get hurt because the isolation point was on a different floor.

A site specific vs generic rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Old names
  • Wrong access
  • Wrong occupancy
  • Hazards for a different task
  • Emergency arrangements for another town

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Start from the job description
  • Name site and people at risk
  • Put the critical control in the method
  • Change it when the job changes
  • Brief the issued version

Occupancy and other people

Occupied vs void, school vs warehouse — occupancy is how generic files die.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Whatever this job uses

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer site specific vs generic rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Can I have a template?
Yes — as a structure. It becomes a RAMS when this site is in it.
Will SafeForJob catch old names?
The product flags likely leftovers; you still read it.
Is generic ever OK?
Not if you are issuing it for a named job.
What is the critical control?
The one that, if skipped, makes the job unsafe — isolation, edge, services.