Guides · UK
RAMS for subcontractors — what PCs actually want
PCs bounce RAMS that still name the last site, miss their permit-to-work, or ignore other trades in the same zone.
On this page
- This site named
- PC permits
- Interfaces
- Their emergency plan
- Package-specific hazards
- Briefing record
Quick answer
A subcontractor RAMS is a site-specific pack you submit to a principal contractor before starting. It should match this site’s rules, permits and interfaces — not your company’s generic trade file.
Primary topic: rams for subcontractors. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Generic trade RAMS
Rejected.
Wrong assembly point
Copied.
No crane interface
Your MEWP in their lift radius.
What to get right on this document
Use their permits
Named.
This postcode
Names.
Interfaces
Other contractors.
What this document has to cover
PCs bounce RAMS that still name the last site, miss their permit-to-work, or ignore other trades in the same zone.
A rams for subcontractors only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Old site names
- Missing PC permits
- No interface with other trades
- Welfare/access assumed
- Emergency arrangements copied from another job
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Read the PC’s site rules
- Name this site and your work package
- Fit their permit system
- Write interfaces (cranes, public, other trades)
- Emergency arrangements for this site
- Brief your people on the approved document
Occupancy and other people
You are a visitor on someone else’s site. Their induction and fire plan override your template’s assembly point.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Whatever your package uses
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer rams for subcontractors document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- GuidesCDM and RAMS responsibilitiesHow contractors use RAMS under CDM without pretending software assigns legal duties. Practical UK guidance for contractors — with links to free tools.
- GuidesHow to write a RAMSA practical sequence: describe the job, list hazards, choose controls, write the method, check names. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWorking at height in RAMSHow to describe access equipment, fragile surfaces and rescue thinking inside a RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS for occupied premisesExtra controls when residents, staff, patients or customers stay in the building. Practical UK guidance for contractors — with links to free tools.
Questions
- Who approves it?
- Usually the PC or their H&S — you still own the content.
- One RAMS for all packages?
- No — package-specific.
- Do labour-only subs need one?
- The contractor providing them still does.
- Can I submit a PDF from SafeForJob?
- Yes — after you review it.