Guides · UK
A competent person reviews and issues a RAMS
People search ‘who signs a RAMS’ and ‘who is competent’. This page stays honest: we do not appoint your competent person, and we do not endorse the pack.
On this page
- Draft vs issued
- Person reviews
- Version frozen
- Crew briefed
- History kept
- Re-review on change
Quick answer
Review means a person who understands the work checks that the isolation, occupancy and substances match this job, then freezes an issued version.
Primary topic: who reviews a rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Unreviewed download
Not issued.
Software as approval
False.
No brief
Crew never saw it.
What to get right on this document
Issue is a person
Not a button.
Competence is this job
Not a logo.
No endorsement
You remain responsible.
What this document has to cover
People search ‘who signs a RAMS’ and ‘who is competent’. This page stays honest: we do not appoint your competent person, and we do not endorse the pack.
A who reviews a rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Issued at 06:50 unreviewed
- AI output treated as a certificate
- Reviewer who has never seen the site
- Draft and issued mixed
- No brief after issue
- Client told the software approved it
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Draft from a job description or library
- Competent person edits isolations, occupancy and COSHH
- Issue a frozen version
- Brief and acknowledge
- Do not overwrite history
- Review again when the job changes
Occupancy and other people
Competence is about this site, not a general trade card on the van.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- COSHH still needs a person who understands the task
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer who reviews a rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesWho signs a RAMS?Signatures mean different things. Who should sign a UK contractor RAMS.
- GuidesIssued vs draft RAMSA draft RAMS is still being edited. An issued RAMS is a frozen version you can brief, acknowledge and retrieve later. Mixing them is how a crew works to yesterday’s isolation point.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWorking at height in RAMSHow to describe access equipment, fragile surfaces and rescue thinking inside a RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesCDM and RAMS responsibilitiesHow contractors use RAMS under CDM without pretending software assigns legal duties. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS for occupied premisesExtra controls when residents, staff, patients or customers stay in the building. Practical UK guidance for contractors — with links to free tools.
Questions
- Does SafeForJob sign the RAMS?
- No. You review and issue it.
- Who is a competent person?
- Someone who understands this work enough to judge the pack. This page does not appoint them and is not legal advice.
- Is this the same as who-signs-a-rams?
- Related. Signing is the freeze. Review is the judgement before that freeze.
- Can AI issue a RAMS?
- No. A tool can draft. A person issues.