Overhead crane JHA

A mobile-crane JHA will talk about outriggers that do not exist. Overhead work is runways, end stops, and production people who walk under the hook because they always have.

Typical scope

  • Daily inspection
  • Load path
  • Nobody under the hook
  • Signal person
  • Tag lines
  • Landing exclusion

Quick answer

An overhead-crane JHA covers lifting with a building crane or gantry: inspection, load chart, path, tag lines, and people under the hook.

Primary topic: overhead crane jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.

What usually goes wrong

These are the operational gaps that make a generic Word JHA fail on the next job.

  • Walkway never closed

    People duck loads.

  • Chain found in the yard

    Uninspected rigging.

  • Two cranes, one bay

    No communication.

Example

Gearbox pick on a process crane

Built from one job description. You review and adjust every item before issuing it.

Ohio Millwright Services · Evendale plant

10-ton overhead crane, Cincinnati plant, packaging paused in the travel path, tag lines, signal person, landing barricaded until slack.

What to get right on this document

Name the crane

Capacity and ID.

Name the pause

Who stops production.

Inspect rigging today

Not last quarter.

What this JHA has to cover

A mobile-crane JHA will talk about outriggers that do not exist. Overhead work is runways, end stops, and production people who walk under the hook because they always have.

An overhead crane jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.

Typical hazards to analyze on this job

  • Dropped load from a failed sling or unsecured pick
  • Swing into a person in a 'habitual' walkway
  • Overload vs the hoist rating
  • Crush at the landing
  • Runway collision with another crane
  • Electrical on an indoor crane

Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.

A job sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.

  • Inspect crane, hooks, and rigging; confirm capacity
  • Plan the path; clear the walkway under the hook
  • Assign a signal person and tag lines
  • Lift, travel, and land with people out of the fall zone
  • Never move a load over occupied workstations without a pause
  • Land, slack, and disconnect before people approach

Other people in the area

Plants have desire-paths under runways. Occupancy control is a pause in production, not a yell. Write who can stop the line.

Chemicals, dust, and SDS inputs

An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:

  • Grease and hydraulic leaks from the hoist
  • Lead paint on old runways if you are on them
  • Cutting or welding if you are repairing the crane — separate job

How SafeForJob helps

  • Describe this job in plain English and get suggested steps, hazards, and controls
  • Edit every line before you download or issue
  • Reuse a previous JHA and catch old client or site names
  • Share a link so the crew can read the current revision and acknowledge it

What this page is not

This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer overhead crane jha for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.

Related pages

All jha by job · JHA by trade · Free JHA generator

Questions

Is a lift plan required?
Follow your program. Reference it in the JHA.
Mobile vs overhead?
Do not copy outrigger talk onto a runway crane.
Who signals?
One person. Write the hand signals or radio.
Can I walk under a load if I hurry?
No. Put it on the JHA so the argument happens before the pick.