JHA by job · US
Gutter install JHA
A steep-slope shingle JHA will talk about the field of the roof and miss a 28-foot eave over a driveway with kids. Gutters are eave work.
Typical scope
- Access method
- Eave fall system
- Drop zone
- Power at corners
- Two-person or lift
- Offcut housekeeping
Quick answer
A gutter-install JHA covers hanging or replacing gutters at the eave: falls, ladder or lift setup, cuts from metal, and the public under the eave.
Primary topic: gutter jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.
What usually goes wrong
These are the operational gaps that make a generic Word JHA fail on the next job.
Shingle JHA
No eave drop zone.
Hero carry on a ladder
20-foot section.
Service drop ignored
Metal gutter + power.
Example
Seamless gutter on a two-story house
Built from one job description. You review and adjust every item before issuing it.
Piedmont Exteriors · East Boulevard neighborhood, Charlotte
Charlotte, fiberglass extension tied off, driveway closed, two-person hang, service drop spotted at the NE corner, offcuts magnet-picked from the lawn.
What to get right on this document
Name access
Ladder vs lift vs scaffold.
Name the power corner
Look up.
Name who is below
Driveway vs sidewalk.
What this JHA has to cover
A steep-slope shingle JHA will talk about the field of the roof and miss a 28-foot eave over a driveway with kids. Gutters are eave work.
A gutter jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.
Typical hazards to analyze on this job
- Fall from a ladder or the eave
- Dropped section striking a person below
- Cuts from sheet metal
- Contact with a service drop at the corner
- Ladder kick-out on wet soil
- Heat or cold at height
Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.
A job sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.
- Choose lift vs ladder based on height and ground
- Set a drop zone under the eave; keep the driveway clear
- Inspect for power at corners
- Hang with two people or a lift — do not walk a 20-foot section on a ladder
- Secure ends before leaving a section
- Housekeep screws and offcuts so they are not in the lawn mower path
Other people in the area
Residential occupancy is kids, dogs, and cars. Commercial occupancy is a sidewalk. Write the exclusion, not 'be careful below'.
Chemicals, dust, and SDS inputs
An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:
- Sealants
- Paint touch-up
- Existing coatings on old gutters
How SafeForJob helps
- Describe this job in plain English and get suggested steps, hazards, and controls
- Edit every line before you download or issue
- Reuse a previous JHA and catch old client or site names
- Share a link so the crew can read the current revision and acknowledge it
What this page is not
This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer gutter jha for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.
Related pages
- JHA by tradeRoofing JHACreate a roofing jha for a named US job. Covers falls through skylights, holes, or an unprotected eave, the order of work, and who else is in the area. Review before issue — not OSHA certified.
- JHA by jobRoofing tear-off JHAWrite a job-specific roofing tear off jha covering fall through a hidden hole or skylight. Review steps, occupancy and controls before you issue. Not an OSHA form.
- GuidesFall protection on a JHAFall protection on a JHA means the system is named for this edge, this height, and this duration — guardrail, PFAS, restraint, warning line, or scaffold — pl…
- JHA by jobRooftop HVAC replacement JHAWrite a job-specific rooftop hvac jha covering fall from the eave or open curb. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobLockout/tagout JHAWrite a job-specific lockout tagout jha covering unexpected startup. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobTrenching JHAWrite a job-specific trenching jha covering cave-in of unsupported walls. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobScissor lift JHAWrite a job-specific scissor lift jha covering tip-over on a grade, grate, or debris. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobBoom lift JHAWrite a job-specific boom lift jha covering electrocution from overhead lines. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobExtension ladder JHAWrite a job-specific extension ladder jha covering fall from a mis-set or overloaded ladder. Review steps, occupancy and controls before you issue. Not an OSHA form.
Questions
- Is this roofing?
- Eave work. Fall rules still apply.
- Seamless machine in the driveway?
- Add struck-by and public. Write the setup.
- Metal roofs?
- Different walking rules. Do not copy shingle walk.
- Commercial box gutter?
- Often a lift and a sidewalk closure. Rewrite.