A 'tools JHA' that lists grinders with saws will miss a guard that was removed and sparks into a hospital plenum. Grinders deserve their own rows.
Typical scope
- Guard on
- RPM match
- Hot-work if sparks travel
- Helper out of plane
- Silica if masonry
- Cord/battery inspection
Quick answer
An angle-grinder JHA covers cutting or grinding metal or masonry with a portable grinder: wheel burst, kickback, sparks as hot work, silica if masonry, and guards.
Primary topic: angle grinder jha. US contractors — review every document before you issue it. SafeForJob is not OSHA-certified and does not replace employer judgment.
What usually goes wrong
These are the operational gaps that make a generic Word JHA fail on the next job.
Tools laundry list
Guard removed.
Cut-off wheel on its side
Burst.
Sparks through grating
No watch.
Example
Cut bolt in a plant mezzanine
Built from one job description. You review and adjust every item before issuing it.
Plains Fabrication · South Omaha plant
Omaha food plant, guard on, hot-work permit because cardboard is below the grating, helper out of the wheel plane, 30-minute watch.
What to get right on this document
Guard is a control
Not optional.
Behind and below
Sparks travel.
Lead/coatings
Test before grind.
What this JHA has to cover
A 'tools JHA' that lists grinders with saws will miss a guard that was removed and sparks into a hospital plenum. Grinders deserve their own rows.
An angle grinder jha only holds up if it names the job location, the people at risk, the critical control, and the order of work. Superintendents reject paragraphs that could apply to any job of this type.
Typical hazards to analyze on this job
- Wheel burst or missing guard
- Kickback into the operator
- Sparks starting a fire
- Silica if grinding masonry
- Noise and fragments to a helper
- Shock from a damaged cord in wet conditions
Likelihood and severity change with occupancy, weather, adjacent trades, and energy sources. Copying last month's scores without walking this location is how people get hurt.
A job sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If lockout, fall protection, or a utility locate is the difference between safe and unsafe, it belongs before the production step — not in a general “PPE will be worn” line.
- Inspect guard, wheel rating vs RPM, and cord/battery
- Set hot-work controls if sparks can reach combustibles
- Use the wheel for its rated material — no side-grinding with a cut-off wheel if forbidden
- Keep helpers out of the plane of the wheel
- Silica method if masonry
- Stop, cool, and fire-watch as needed
Other people in the area
Sparks travel through grating onto occupied floors. Occupancy is the space below, not just the operator's face.
Chemicals, dust, and SDS inputs
An SDS is an input, not a JHA. If these materials appear on the job, the analysis should name quantity, duration, who is exposed, and the controls you will actually use:
- Metal grinding fume
- Silica from masonry
- Coatings including lead — test before grind
How SafeForJob helps
- Describe this job in plain English and get suggested steps, hazards, and controls
- Edit every line before you download or issue
- Reuse a previous JHA and catch old client or site names
- Share a link so the crew can read the current revision and acknowledge it
What this page is not
This page is not OSHA approval, legal advice, or a substitute for employer judgment. OSHA does not mandate a single universal JHA form. This page helps you draft a clearer angle grinder jha for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a JHA is, JHA vs JSA, the free JHA generator, and OSHA 3071 — Job Hazard Analysis.
Related pages
- JHA by tradeGeneral contractor JHACreate a general contractor jha for a named US job. Covers trade-on-trade struck-by in a shared corridor or shaft, the order of work, and who else is in the area. Review before issue — not OSHA certified.
- JHA by jobScissor lift JHAWrite a job-specific scissor lift jha covering tip-over on a grade, grate, or debris. Review steps, occupancy and controls before you issue. Not an OSHA form.
- GuidesWhen to update a JHAUpdate a JHA when the job, location, energy sources, occupancy, weather, or crew competence changes in a way that makes yesterday's controls untrue. Reuse th…
- JHA by jobRooftop HVAC replacement JHAWrite a job-specific rooftop hvac jha covering fall from the eave or open curb. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobLockout/tagout JHAWrite a job-specific lockout tagout jha covering unexpected startup. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobTrenching JHAWrite a job-specific trenching jha covering cave-in of unsupported walls. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobBoom lift JHAWrite a job-specific boom lift jha covering electrocution from overhead lines. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobExtension ladder JHAWrite a job-specific extension ladder jha covering fall from a mis-set or overloaded ladder. Review steps, occupancy and controls before you issue. Not an OSHA form.
- JHA by jobRoofing tear-off JHAWrite a job-specific roofing tear off jha covering fall through a hidden hole or skylight. Review steps, occupancy and controls before you issue. Not an OSHA form.
Questions
- Is grinding hot work?
- When sparks can start a fire, treat it as such.
- Battery grinders?
- Still RPM, still guards, still fragments.
- Masonry?
- Add silica. Do not copy a metal-only JHA.
- Who inspects wheels?
- The user, every time. Ring-test if your program requires.