Skip to content
SafeForJob

COSHH by substance · UK

Rodenticide COSHH assessment

A COSHH that only talks about gloves for the technician misses the point of bait stations.

What this assessment usually covers

  • Authorised use
  • Stations
  • Mapping
  • Non-target
  • Remove unused
  • Records

Quick answer

A rodenticide COSHH assessment covers using professional baits. The harm is not only the operator — children, pets and wildlife are reasonably foreseeable.

Primary topic: rodenticide coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Loose bait behind a fridge in a café

    Child/pet.

  • No map

    Cannot retrieve.

  • Left down forever

    Wildlife.

What to get right on this document

Stations and map

Non-target control.

Authorisation

Not DIY farm mix.

Retrieve

End of treatment.

What this document has to cover

A COSHH that only talks about gloves for the technician misses the point of bait stations.

A rodenticide coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Poisoning of non-target species (children, pets, wildlife)
  • Operator ingestion/absorption
  • Secondary poisoning
  • Environmental contamination

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Use only as the product authorisation allows
  • Tamper-resistant stations, mapped
  • Never loose bait in a school kitchen
  • Records and inspections
  • Remove uneaten bait at the end
  • PPE as SDS when handling

Occupancy and other people

Schools, food rooms and gardens: non-target exposure is the occupancy issue.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Anticoagulant or other authorised rodenticide

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer rodenticide coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Do I need a RAMS as well?
Often yes for access and lone work; COSHH is the bait.
Food premises?
Tighter placement rules — follow the label and client.
Outdoor burrow baiting?
Only if authorised for that use.
Who is the COSHH for?
Operator and anyone who could contact bait.