Glycol antifreeze COSHH assessment

An R32 refrigerant COSHH reused for glycol misses the drain, the pet in a plant courtyard, and that ‘food-safe’ glycol is still not a drink. Ethylene and propylene glycol are different SDS.

What this assessment usually covers

  • Glycol type named
  • Drain seals first
  • No tasting / no siphon by mouth
  • Spill kit
  • Waste route
  • Fill points labelled

Quick answer

A glycol-antifreeze COSHH assessment covers charging, draining or spilling mono- or propylene-glycol mixes on HVAC and heat-pump jobs. Swallowing, slip, and pollution of a gully are typical. An SDS is not a COSHH assessment.

Primary topic: glycol antifreeze coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • R32 COSHH reused

    Wrong substance.

  • Flushed to a surface drain

    Pollution.

  • Open drum in a playground compound

    Swallowing hazard.

What to get right on this document

Name ethylene vs propylene

From the SDS.

Spill before you break in

Drains sealed.

SDS informs COSHH

It is not COSHH.

What this document has to cover

An R32 refrigerant COSHH reused for glycol misses the drain, the pet in a plant courtyard, and that ‘food-safe’ glycol is still not a drink. Ethylene and propylene glycol are different SDS.

A glycol antifreeze coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Swallowing (especially ethylene glycol) and skin wetting on a long drain-down
  • Slips on spilled mix
  • Pollution of surface water
  • Mist if you spray or pressure-test badly
  • Contamination of drinking-water systems if you use the wrong fill point
  • Waste left in open drums

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Name ethylene vs propylene from the SDS and the design
  • Spill kit and drain seals before you break a fitting
  • Decant with a pump, not a mouth tube
  • Ventilate if heating a mix; do not spray as a convenience
  • Dispose of waste glycol as hazardous unless your waste advice says otherwise
  • Label filled systems so the next person does not taste-test

Occupancy and other people

Schools and housing plots sit on gullies and playing fields. A spill reaches a watercourse faster than a van can get a boom.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Ethylene or propylene glycol mix (name it)
  • Inhibitors in the mix
  • Water used to flush (contaminated)

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer glycol antifreeze coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is propylene glycol harmless?
Lower acute toxicity than ethylene — still assess slips, spill and the actual SDS.
Ground-source charge?
Attach this COSHH to the GSHP RAMS.
Can I reuse one sheet for all brands?
Only if concentration and inhibitors match.
Is an SDS enough?
No.