Diesel exhaust COSHH assessment

A diesel fuel sheet is the wrong story. If the assessment does not mention the enclosed volume, duration and who shares the air, it is not ready.

What this assessment usually covers

  • Product named from the SDS in your hand
  • The enclosed volume, duration and who shares the air
  • Hierarchy: substitute or extract before RPE
  • Wash facilities where the SDS requires them
  • Occupants briefed if they share the air
  • SDS informs COSHH — it does not replace it

Quick answer

A diesel exhaust coshh assessment covers running diesel plant in a basement, street or enclosed dock on your job. An SDS is not a COSHH assessment. Write the enclosed volume, duration and who shares the air — quantity, duration, who is exposed and the controls you will actually use.

Primary topic: diesel exhaust coshh assessment. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • diesel fuel sheet reused

    Wrong substance or task.

  • SDS PDF treated as the assessment

    Rejected.

  • Occupancy ignored

    Bedroom windows and the dock door

What to get right on this document

Name this product

From the SDS you have, not a sister sheet.

The task is the assessment

The enclosed volume, duration and who shares the air

SDS ≠ COSHH

Quantity, duration, who is exposed.

What this document has to cover

A diesel fuel sheet is the wrong story. If the assessment does not mention the enclosed volume, duration and who shares the air, it is not ready.

A diesel exhaust coshh assessment only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Inhalation of exhaust in a basement or dock
  • CO and particulates
  • Public at a pavement generator
  • Running plant in a closed loading bay
  • Confusion with ‘it’s only diesel in the can’
  • Night work in a courtyard under bedrooms

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Prefer mains or staged plant if it meets the job
  • Do not run plant in a closed basement
  • Extract or open doors as planned
  • Limit duration; exclude occupants
  • Position exhaust away from intakes
  • Shut down when not needed

Occupancy and other people

Basements and courtyards stay occupied above. Write bedroom windows and the dock door.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Diesel exhaust
  • Residues already on the substrate
  • Dilution or mix as actually used

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer diesel exhaust coshh assessment document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All coshh by substance · RAMS by trade · Free RAMS generator

Questions

Is an SDS enough?
No. An SDS is an input to a diesel exhaust coshh assessment, not the assessment.
Can I copy a diesel fuel sheet?
No. Diesel exhaust has its own SDS and this task is running diesel plant in a basement, street or enclosed dock.
Who is exposed?
Write the enclosed volume, duration and who shares the air. Occupants count if they share the air.
Can AI issue this COSHH?
A tool can draft. A competent person reviews this diesel exhaust assessment for this task.