Temporary site power RAMS

Temporary supplies are moved, overloaded and borrowed. The RAMS has to treat the installation as changing, not as a one-off ‘set and forget’.

Typical scope

  • Earthing arrangement
  • RCD protection
  • Cable routes
  • Fuel storage
  • Daily inspection
  • Decommission

Quick answer

A temporary site power RAMS covers generators, distribution and trailing supplies on a construction or event site. It should address earthing, RCDs, fuel, exhaust, and how the installation is inspected while the site changes around it.

Primary topic: temporary site power rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Office RAMS reused

    No generator, fuel or RCD content.

  • Cables in the mud

    No route or protection stated.

  • Refuel while running

    Method silent on fuel discipline.

Example

Welfare and tower-crane supply

Built from one job description. You review and adjust every item before issuing it.

Job description

Install a 60 kVA generator and site distribution at the Riverside frame, Salford. Position downwind of welfare, earth as designed, protect cable crossings on the haul road, inspect daily until grid power is live.

Activities identified

  • General site work
  • Electrical isolation
  • Manual handling

Method (9 steps)

  1. 1.Arrive and sign in. Arrive at Riverside Frame, Salford, report to the Riverside Frame JV site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  7. 7.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  8. 8.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  9. 9.Hand over and sign out. Hand over to the Riverside Frame JV site contact, report anything outstanding and sign out.

Main risks (2 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Treat it as an installation

Earthing, labelling and inspection, not a ‘genny in the corner’.

Fuel is COSHH and fire

Store, spill and exhaust belong in the RAMS.

Inspect as the site moves

Daily checks when cabins and plant shift.

What this document has to cover

Temporary supplies are moved, overloaded and borrowed. The RAMS has to treat the installation as changing, not as a one-off ‘set and forget’.

A temporary site power rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Electric shock from damaged leads or missing RCD protection
  • Fire from generators, fuel and overloaded boards
  • CO from poorly sited exhausts
  • Manual handling of cable and generators
  • Vehicle interface when towing or refuelling
  • Water and mud degrading connections

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree load, earthing and generator position before delivery
  • Set exclusion, spill kit and exhaust direction
  • Install distribution with RCD protection and labelled outlets
  • Daily visual checks recorded as the site changes
  • Refuel with engine off and no smoking zone
  • Decommission, test and remove at the end of the phase

Occupancy and other people

Construction sites and events have public or multi-contractor interfaces. Cable routes cannot cross pedestrian desire-lines without protection.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Diesel
  • Oil and grease
  • Exhaust emissions (CO / particulates)

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer temporary site power rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Do I need a separate COSHH for diesel?
Yes if you store or refuel — attach it.
Who inspects?
Name the person and frequency; ‘as required’ is not a control.
Events vs construction?
Public interface is tighter on events; write the actual crowd plan.
Can I daisy-chain boards?
Only as the design allows. Overload is a RAMS and installation issue.